About Cold Energy (NCT)

In brief. Cold Energy (NCT) is a Russian full-cycle industrial cooling company. We have designed cooling plants and energy centers since 2011 and manufactured NCT equipment since 2015; we supply, install and service these plants and exclusively represent Thermax absorption chillers and heat pumps in Russia and the CIS.

Cold Energy (NCT) — registered in Russia as Energiya Kholoda LLC — is a full-cycle engineering company in industrial cooling. We design cooling systems, manufacture equipment under the NCT brand, supply Thermax absorption chillers, and install, commission and service cooling plants and energy centers. We can run a project end to end or take on a single stage. The company is headed by its CEO and owner Maxim Krasnov.

The company at a glance

  • In business since 2011; the legal entity was registered in 2012.
  • Activities: design, equipment manufacturing, supply, installation and commissioning, service, turnkey cooling plants and trigeneration energy centers.
  • Own NCT brand since 2015: cooling towers, chillers, dry coolers, evaporative condensers, pump skids, control panels — nc-t.ru.
  • Since 2011 — official and exclusive representative of Thermax absorption chillers and absorption heat pumps in Russia and the CIS — abxm-thermax.ru.
  • Our share of the absorption chiller market in Russia is 65 %.
  • Our share of the Russian market for modular fan-assisted cooling towers is 40 %.
  • Head office: 44 bldg. 2, Industrialny Prospekt, St. Petersburg. Production site: Sertolovo, Leningrad Region.
  • 100+ projects a year, selection from 5,000+ equipment sizes.
  • Quality management system certified to GOST R ISO 9001-2015 (ISO 9001:2015); our production has passed a Gazprom audit.
  • The first company in Russia and the CIS to become a member of the Cooling Technology Institute (CTI, USA); NCT has been a member since April 2024.

What we do

Area What we do
Cooling system engineering Concept, feasibility study, design and working documentation, support during state expert review
Equipment manufacturing NCT cooling towers, chillers, dry coolers, condensers, pump skids and controls
Turnkey cooling plants On NCT chillers and cooling towers, on Thermax absorption chillers and heat pumps, or combined
Trigeneration energy centers Combined generation of electricity, heat and cooling
NCT air-cooled chiller, control panel side
NCT air-cooled chiller, control panel side

One company responsible for the whole project

Our principle is to keep responsibility within one company. Design, manufacturing, supply, installation, commissioning and service are handled by one organization, so the client does not have to coordinate several contractors or work out who is to blame at the interfaces.

To make this possible, we have in-house:

  • a design department — standard and custom cooling solutions;
  • an engineering bureau — new technical solutions that we then apply on site;
  • an R&D department — testing and refining calculation methods;
  • quality assurance and technical inspection;
  • machining, assembly and painting shops, a control panel assembly area, our own programmers;
  • logistics — supply of Russian and imported equipment, transport and customs clearance;
  • installation and commissioning — setting up and starting complex and non-standard cooling equipment;
  • a service team that supports the site after handover.
Cold Energy production shop in Sertolovo
Cold Energy production shop in Sertolovo

Localized production

NCT equipment is made entirely in Russia. Around 85 % of components and spare parts are produced in Russia, which shortens manufacturing and delivery times and keeps prices low. We offer replacements for imported cooling towers, chillers, dry coolers and other cooling equipment.

R&D and the selection software

Our R&D department runs comprehensive tests, optimizes calculation methods and quickly brings the results into production. Our engineers developed an online equipment selection program: it performs the thermal calculation automatically in 2 minutes and draws on R&D test results, so we guarantee the stated specifications. The client gets an accurate selection from more than 5,000 equipment sizes.

New production complex

In June 2025, at the St. Petersburg International Economic Forum, Cold Energy and the St. Petersburg Committee for Industrial Policy, Innovation and Trade signed an agreement to build a research and production complex.

Parameter Value
Site Novoorlovskaya special economic zone, St. Petersburg
Area 2.5 ha
Project cost about 4 billion rubles
New jobs 180
Products industrial cooling towers and chillers with a high share of Russian components
Timeline the next five years

Company history

Year Milestone
2011 Start of operations, exclusive Thermax representation in Russia and the CIS
2012 Energiya Kholoda LLC registered
2014 Joined the SRO NP Sodruzhestvo Proektnykh Organizatsiy: approval for design work
2016 Launch of NCT equipment manufacturing; the same year we started making control panels, pump skids and water treatment systems
2023 The SRO approved the company to design especially hazardous, technically complex and unique facilities
2024 NCT joined the Cooling Technology Institute (CTI, USA)
2025 Agreement to build a research and production complex in the Novoorlovskaya SEZ

Frequently asked questions

Since when has Cold Energy been in business?

Since 2011; the legal entity was registered in 2012. We have been the official and exclusive representative of Thermax in Russia and the CIS since 2011 and have manufactured our own NCT equipment since 2015.

Where is the production?

In Sertolovo, Leningrad Region. The head office is in St. Petersburg, 44 bldg. 2, Industrialny Prospekt. A new 2.5-hectare research and production complex is being built in the Novoorlovskaya SEZ.

Who runs the company?

CEO and owner Maxim Krasnov.

Can one company deliver the whole project?

Yes. We handle design, manufacturing, supply, installation, commissioning and service, so one organization is responsible for the result. If needed, we also take a single stage — for example, design only or supply only.

Watch: about the company (in Russian)

Cold Energy: many tasks, one team

Let us size a cooling system for your site

An engineer will select the equipment and send you a calculation. Free of charge, no obligation.

Contact us