Cooling tower maintenance and repair
In brief. One company is responsible for NCT cooling towers — it manufactures and installs them, sets up the water treatment and services them; we clean and repair cooling towers to schedule, install automatic NCT water treatment, prepare the circuit for winter and check whether the cooling tower holds the design temperature, because it loses capacity through dirt, scale and winter mistakes, not age.

We take on the full scope of NCT cooling tower maintenance and repair: we clean the fill and water distribution, set up water treatment, prepare the circuit for winter, replace worn components and check whether the cooling tower delivers its capacity. One company is responsible: we manufacture NCT cooling towers at our own plant in Sertolovo (Leningrad Region), install them with our own crews, start them up and service them ourselves, so components and water treatment panels come from our own production.
A cooling tower stops cooling water to the design temperature not because of age, but because of dirt, scale, poor water and winter mode mistakes. About 610,000 m³/h of air passes through a 1,000 m³/h cooling tower — even with low dust levels this is about 1.5 kg of dirt per day, and part of it settles in the circulating water.
What is included in the work, and who is responsible for what?
| Stage | What we do | Result for the customer |
|---|---|---|
| Survey | We check the load and the weather, and measure the water flow, temperatures and air parameters on site | It is clear where the cause lies — in the cooling tower, the load or the piping |
| Decision | Component repair or replacement of the cooling tower with NCT, selection of W0C, W2C or W3C water treatment | A justified choice rather than replacement "just in case" |
| Manufacturing and supply | Fill, drift eliminators, fans, water treatment panels and new NCT cooling towers — from our plant | Components without waiting for imports |
| Installation and component replacement | Installation and replacement by our own crews | No disputes between the supplier and the installer |
| Commissioning | We set up conductivity-based blowdown, match the chemicals to the water and the production process, and set the winter mode | The cooling tower reaches the design temperature |
| Maintenance | Scheduled maintenance, winter preparation, remote monitoring on request | Emergencies show up early |
Why one company instead of three contractors?
If one company supplied the cooling tower, another the water treatment and a third services it, then when capacity drops each looks for the cause with the others. With us, one team is responsible for every stage.
- Our own plant. We have been manufacturing NCT cooling towers in Sertolovo since 2015; they account for 40% of the Russian market for modular fan-assisted cooling towers. Fill, drift eliminators and water treatment panels come from the same production.
- Capacity checks to international rules. Since April 2024 NCT has been a member of the Cooling Technology Institute (CTI, USA), the first in Russia and the CIS; cooling tower acceptance tests are carried out under CTI codes.
- Cooling towers and absorption chillers at one plant. If the cooling towers serve Thermax absorption chillers, one service team maintains the whole plant: we have been the official and exclusive representative of Thermax in Russia and the CIS since 2011 (about absorption chillers).
- Handover after integrated testing. The system is accepted after running under process load, usually for 72 hours.
- Warranty. Standard — 12 months; up to 5 years with our installation and a service contract; against perforation corrosion — 10 years.
Open and closed-circuit NCT cooling tower models are in the catalog on nc-t.ru (in Russian).
Why does a cooling tower stop cooling?
- Deposits on the fill and nozzles — water is distributed in patches, and part of the fill does not work.
- Scale — the circuit concentrates without blowdown, and salts deposit on the user's heat exchangers and in the cooling tower itself.
- Biofilm — it holds dirt and shields the metal from the inhibitor; pitting corrosion develops underneath.
- Plume recirculation — the cooling tower draws in its own warm humid discharge because of walls or neighboring units.
- Winter mistakes — icing, frozen pipes, diluted glycol in a closed circuit.
If a cooling tower does not hold the temperature, we first check the load and the weather: sometimes the unit is fine, but more heat has entered the circuit than the design allowed for.
What does cooling tower maintenance include?
| Component | What we do | Why |
|---|---|---|
| Fill and water distribution | inspection, flushing, replacement of damaged packs, nozzle cleaning | even water distribution — full capacity |
| Drift eliminators | inspection, cleaning, replacement | water loss and aerosol near air intakes |
| Basin and filters | sludge removal, check of level and make-up | dirt does not go into the heat exchangers |
| Fans and motors | direction of rotation, blade angle, vibration, VFD | design airflow, motor service life |
| Water treatment | conductivity, cycles, dosing, samples | no scale, corrosion or bacteria |
| Winter package | basin heating, bypass, heat tracing and draining of pipes | the cooling tower does not freeze up |
How to set up water treatment?
Evaporation takes away pure water, while the salts stay behind. To keep them from turning into scale, part of the water is continuously discharged — this is blowdown. We control it automatically by conductivity: the setpoint equals the make-up water conductivity multiplied by the allowable number of cycles of concentration. In practice we keep 3–6 cycles; above six, water savings barely increase, while the risk of scale does.
For this we install NCT water treatment panels:
- W0C — conductivity control and automatic blowdown, for good water and small circuits;
- W2C — plus inhibitor and biocide dosing, the standard choice;
- W3C — full automation, make-up metering, three chemicals on a schedule, for difficult water and large circuits.
Two more rules that save a cooling tower: we do not let make-up hardness drop below 30 mg/l, because fully softened water is aggressive to metal; and on new galvanizing — the coils of closed-circuit cooling towers, tanks, pipes — we keep the pH below 8.2 for the first weeks, otherwise "white rust" eats the coating within a season or two. For dirty water we add a side-stream filter for 3–7% of the circulation flow.
Circulating water limits that NCT recommends keeping so that the cooling tower lasts its full service life:
| Parameter | Casing with internal polymer coating, or 304L stainless steel | Uncoated galvanized steel |
|---|---|---|
| pH | 6.5–9.2 | 6.5–9.0 |
| Total hardness (as CaCO₃) | 50–750 mg/l | 70–600 mg/l |
| Total alkalinity (as CaCO₃) | up to 600 mg/l | up to 500 mg/l |
| Total dissolved solids | up to 2,050 mg/l | up to 1,500 mg/l |
| Chlorides | up to 300 mg/l | up to 250 mg/l |
| Sulfates | up to 350 mg/l | up to 250 mg/l |
| Conductivity | up to 3,300 µS/cm | up to 2,400 µS/cm |
| Suspended solids | up to 25 mg/l | up to 25 mg/l |
| Free chlorine, continuous dosing | up to 1.5 mg/l | up to 1 mg/l |
For cleaning and shock disinfection, 5–15 mg/l of free chlorine for 6 hours is acceptable. Ozone treatment requires a cooling tower of 316L stainless steel.
Chemicals are matched to the production process as well as to the water. For example, at an aluminum profile plant in Naberezhnye Chelny, the antiscalants and biocides reacted with substances from production at commissioning, and they were replaced with other brands. The plant's cooling towers were also connected to remote monitoring and diagnostics over the internet, so emergencies became visible early.
How to prepare a cooling tower for winter?
We set a minimum water temperature and hold it with variable frequency control of the fans or by switching off sections, install a winter bypass with a three-way valve, switch on basin heating, and drain or heat-trace the outdoor pipes. Closed-circuit cooling towers run on glycol or in dry mode. Details in the article How to choose a cooling tower for winter operation (in Russian).
How to check that a cooling tower delivers its rated capacity?
An instantaneous outlet temperature proves nothing: it depends on the load and the air humidity. In international practice, acceptance tests of an open cooling tower are carried out under CTI code ATC-105, and of a closed-circuit cooling tower under ATC-105S: within 12 months of operation, after at least 1,000 hours of fill operation under load, with clean fill and nozzles. Before a dispute with the supplier, we measure the water flow, temperatures and air parameters on site and show where the cause lies — in the cooling tower, the load or the piping.
Repair or replace?
If the casing of an NCT cooling tower is intact and the problem is in the fill, nozzles, drift eliminators or fans, we repair the components. We do not repair cooling towers of other brands, but we can replace them with NCT. If a cooling tower freezes up, does not hold the temperature after cleaning and there are no parts for it, we replace it. For example, for Trubodetal (in Russian), old Soviet cooling towers were replaced with NCT VR units with W2C water treatment; for Moloko JSC (in Russian), a field-erected cooling tower was replaced with three modular VR units. How a replacement is carried out — on the cooling tower installation page.
Among many other sites where maintenance was built in at the design stage: at Moll-Elit wallpaper factory (in Russian) there is W0C water treatment with level control and basin heating; at DEP LLP dairy plant (in Russian) — VR cooling towers with a standby electric motor and a W2C panel; at SvetlogorskKhimvolokno (in Russian) — a stainless steel cooling tower with heating and variable frequency control.
The "Summer Cooling Readiness Checklist" (17 pages: checks for chillers, cooling towers and absorption chillers 6, 4 and 2 weeks before the heat, based on 337 cases in our deviation log) is available by email or Telegram: get it on the resource page.
A detailed breakdown is in the article Cooling tower repair and fill replacement: how it is done (in Russian).
Frequently asked questions
Will you sell spare parts or new fill for a cooling tower from another manufacturer? And can you install them yourselves?
We sell spare parts. For Evapco, Decsa and Baltimore closed-circuit cooling towers, we make replacement heat exchanger coils. For other makes, send the tower model and the dimensions of the old part. We do not repair or provide scheduled maintenance for other manufacturers’ towers. Your contractor or maintenance team installs the part. To size a complete replacement NCT modular tower, we need the water flow rate, inlet water temperature, heat load, design wet-bulb temperature and available footprint.
The make-up water is softened and the hardness is zero. There is no scale, so the water is fine?
No. Softening replaces the hardness salts with sodium salts but does not lower the total dissolved solids. With zero hardness, the alkalinity and dissolved solids in the circuit easily exceed the manufacturer's limits. Chemicals do not cure this; acid only trades one exceedance for another. Dissolved solids are reduced by membranes: make-up from reverse osmosis with a small admixture of softened water, because pure water after reverse osmosis is aggressive to copper. A water quality log is also needed.
Should water be drained from the basin for the winter and the cooling tower covered?
While the cooling tower is running, there is no need to drain it: the water circulates and receives heat from the process. A shutdown is what is dangerous. If the basin has a heater, the water can be left in, but the outdoor pipes and pump piping are still drained or heat-traced. Basin heating does not protect the pipes, and without water it will not switch on: the level sensor blocks it. Without heating, during a long shutdown the water is drained according to the manual for your model. There is no need to cover the cooling tower; covers are not provided for it.
The cooling tower iced up in winter, or the heat exchanger of a closed-circuit cooling tower froze. Is this a warranty case?
As a rule, no. Icing caused by winter conditions is not covered by the warranty, and after the heat exchanger freezes, the closed-circuit cooling tower is taken off warranty. We still check the cause of icing with a site visit by a specialist: most often the heat load does not match the settings, and on fan-assisted cooling towers the problem is solved by variable frequency control of the fans. If operation will be in winter and intermittent, the type of cooling tower is best discussed at the selection stage.
The float of the level sensor sticks, and the make-up water flows on and off. What should we do?
Replace the float sensor with a sensor that has no moving parts. A hydrostatic sensor sits in the water and measures the level by the pressure of the liquid column; there is nothing in it to stick. We have already made this replacement on operating cooling towers. At the same time, check the make-up valve: its voltage must match the panel diagram, otherwise the valve may fail right after start-up. Until the sensor is replaced, watch the level in the basin: without make-up, the pumps will stop.
A fan bearing seized on the cooling tower, and the fan wheel itself broke. Why does this happen?
From our investigations, the cause is usually lubrication. There is too little of it or it is the wrong kind: friction increases, the bearing overheats and seizes, and the rotation is transmitted further to the shaft, the wheel and the casing. Use only water-resistant grease with a corrosion inhibitor, and take the interval from the data sheet of the model. On some belt-driven units it is shorter. A high-pressure grease gun tears the seals. Vibration diagnostics reveals the defect in advance: pitting on the ring is visible before the bearing seizes.
Cooling tower maintenance and repair is part of our service; chillers at the same plant are covered on the Chiller repair (in Russian) page. Send us the cooling tower type, the flow rate and what is wrong — submit a request or call +7 (800) 333-49-96.
Watch: cooling towers (in Russian)
NCT to the rescue: cooling tower maintenance workLet us size a cooling system for your site
An engineer will select the equipment and send you a calculation. Free of charge, no obligation.