Cooling tower installation and replacement
In brief. We take on turnkey cooling tower installation, and the replacement of a worn-out one, in full: survey, design, NCT cooling towers from our own plant (in stock or in 10–12 weeks), pad, piping, pump skid, water treatment, controls, handover after integrated testing and 24/7 service. A modular cooling tower is assembled on site in 1–2 days.

We take on turnkey cooling tower installation, as well as the replacement of old cooling towers, in full, and we alone are responsible for the result. We survey the site, design the system, make NCT cooling towers at our own plant in Sertolovo (Leningrad Region), build the pad, piping, pump skid, water treatment and controls with our own crews and hand the system over after integrated testing, usually 72 hours under process load. One company is responsible for the water temperature in summer, not a chain of supplier, designer and installer.
A modular NCT cooling tower is assembled on site in 1–2 days; it may be in stock, and if not, the lead time is 10–12 weeks. Most of the installation time goes not into the unit itself but into the pad, piping, pump skid, water treatment and commissioning. We replace worn-out Soviet and imported cooling towers, often without touching the rest of the system.
What does the work include, and who is responsible for what?
| Stage | What we do | Result for the customer |
|---|---|---|
| Survey and input data | heat load, flow rate, temperatures, local wet-bulb temperature, site, water analysis | the cooling tower is selected for the actual site conditions |
| Design | layout, loads on the foundation or roof, piping, controls, winter mode; the design is produced by our engineering center, which holds an SRO (self-regulatory organization) certificate and GOST ISO 9001 | it is clear what goes where and how before work begins |
| Manufacturing and supply | we make the cooling towers at our own NCT plant; in stock or in 10–12 weeks; factory testing at the customer's request | lead times and spare parts straight from the manufacturer |
| Pad | foundation or support frame; on a roof, a check of load-bearing capacity and vibration isolation | the base carries the cooling tower and does not transmit vibration |
| Cooling tower assembly | 1–2 days per module; VR sections are assembled into a cascade of up to 5,000 m³/h | the unit is in place in days, not weeks |
| Piping | pipework, NCT PU pump skid, tank, filters, water treatment panel | the circuit is ready for testing |
| Electrical and controls | control panel with variable frequency control of the fans, basin heating | fans and heating run to the set mode, including in winter |
| Commissioning and handover | hydraulic testing, tuning of controls, integrated testing, usually 72 hours under process load | the system is handed over at operating parameters |
| Service | 24/7 maintenance, online monitoring | after start-up, the company that installed the system is the one responsible |
Installation at an operating plant takes the longest and is the hardest. For example, at a foundry in Tver, the cooling system for the induction furnaces was built without stopping the melting shop. There were no as-built drawings of the shop, the pipes to the furnaces were routed on site, and the foundation slab was poured in winter. The system consists of a cooling tower, a chiller with a remote condenser, a pump skid, a tank and water treatment. The cooling equipment was placed in a modular building: first it was set in its design positions, then the walls went up around it.
Why one company instead of three contractors?
When one firm supplies the cooling tower, a second builds the pad and piping and a third does the commissioning, after a failed start-up each points at the others. We do not have that dispute: selection, installation and reaching the target temperature are the responsibility of one company.
- Our own plant. We have been making NCT (in Russian) cooling towers in Sertolovo since 2015; we hold 40% of the market for modular fan-assisted cooling towers. Since April 2024 NCT has been a member of the Cooling Technology Institute (CTI, USA), the first in Russia and the CIS. Our production has passed audits by Gazprom and Rosatom.
- For absorption chillers, from the official representative. If the cooling tower serves a Thermax absorption chiller, one company handles both the machine and the cooling tower: we have been the official and exclusive representative of Thermax in Russia and the CIS since 2011.
- Handover after integrated testing, usually 72 hours under process load.
- Warranty. The standard warranty is 12 months; with our installation and a service contract, up to 5 years; 10 years against through-corrosion.
Where should a cooling tower be installed?
Siting mistakes eat up capacity just as selection mistakes do. The main rules:
- do not let the cooling tower breathe its own discharge. Warm humid air that gets back to the intake raises the water temperature. We calculate the distances to walls and between cooling towers rather than judging them "by eye";
- keep drift away from ventilation air intakes and windows;
- on a roof, calculate load and vibration. At an automotive plant in St. Petersburg we installed a cooling tower on the roof of a production building (in Russian), added a pump module, did the piping and upgraded the cooling control for the welding machines;
- allow for noise: with residential buildings nearby we install quiet fans or silencers.
The "Cooling Tower Design Checklist" (56 checks on 10 pages: design duty, water balance, pumps, winter, site layout) is available by email or Telegram: get it on the resource page.
When is it time to replace an old cooling tower?
When it does not cool the water to the design temperature, freezes up in winter, needs constant repairs or parts for it are no longer available. We do not repair or service other manufacturers' cooling towers, but we sell spare parts and equivalents for them, if it is still too early to replace the whole tower. Examples of our replacements, among many others:
| Site | What was there | What we installed | Work |
|---|---|---|---|
| Trubodetal, Chelyabinsk (in Russian) | Soviet cooling towers and GRAD cooling towers could not cope with cooling the water for machine tools | NCT VR cooling tower, W2C water treatment, control panel | supply following a tender, year-round operation |
| Moloko JSC, Kaliningrad (in Russian) | an outdated field-erected cooling tower | three NCT VR cooling towers, one shared control panel for the three towers | custom layout design |
| Duvon Rus auto components plant, Leningrad Region (in Russian) | a failed imported cooling tower that had been running since 2010 | three NCT SVA-1 cooling towers from stock | installation supervision and commissioning, installation in winter |
| Tatprof, Naberezhnye Chelny (in Russian) | the old cooling towers iced up: the fan drew in the tower's own vapor, and fans had to be replaced about once a month; the 45/25 °C duty was not held | two NCT VR2 cooling towers, 250 m³/h and 5.8 MW, W2C water treatment, a panel with variable frequency control | design of the recirculating water system in 5 weeks, commissioning in one week; the next year the plant ordered another tower |
| International tobacco company (in Russian) | cooling was needed for the chiller of an industrial air conditioning system | four NCT VR cooling towers with control panels | installation supervision and commissioning in two stages |
How much does cooling tower installation cost?
The price is made up of equipment and work. Guide prices for equipment: NCT SVA open cooling towers from RUB 820,000, VA from RUB 1,730,000, VR from RUB 1,850,000. The cost of installation depends on the site, the lifting height, the length of the piping runs and the scope of the piping; we calculate it after a survey and based on the design. Selection and a preliminary layout are free of charge.
Modular or field-erected cooling tower?
For most tasks we install factory-assembled modular cooling towers: they are assembled in days, and we fix their capacity in the contract. A field-erected cooling tower, built on site, makes sense at very large flow rates, around 30,000 m³/h and above, where modular units would turn into a field of dozens of units. We take on such projects too, but start with a joint technical specification.
How to prepare a cooling tower for winter?
We build this into the installation from the start: variable frequency control or switching off sections, a winter bypass with a three-way valve, basin heating, draining and heat tracing of outdoor pipes, and glycol for a closed circuit. On NCT VR cooling towers the position of the air inlet and motor lowers the risk of icing; the winter mode is confirmed at selection. More in the article How to choose a cooling tower for winter operation (in Russian).
Frequently asked questions
We are handing over the facility in winter and there is no heat load. Can the cooling tower be commissioned?
It can, by agreement, but this is a check of the settings and of how the components work, not a confirmation of cooling. Capacity cannot be seen this way. So in the annex to the certificate we record right away what has been checked and what remains: makeup water, the sensor range in the frequency converter, the external control signal. The parameters are confirmed separately under design conditions: the specified inlet water, the design flow rate, a known wet-bulb temperature. Agree in advance when the load will appear and who will come to take the measurements.
We will weld nozzles and flanges to the cooling tower casing on site. What can go wrong?
Welding damages the protective zinc layer, and corrosion starts from that spot. That is why it is better to order the flanges as a factory kit: they are welded to the nozzles and hot-dip galvanized at the plant. This is an option; it is included in the design from the start, and later it will no longer help. The same goes for a rooftop service platform: the standard one requires drilling into the structures. If drilling is not allowed, we develop a custom one; for this we need data on the load-bearing structures and the elevation mark.
Can we put our own control panel and VFD on the cooling tower and order only commissioning from you?
You can, but agree in advance who is responsible for what. With someone else's panel and VFD, tuning may run into the drive parameters, and then the scope and payment for commissioning become disputable. So send the panel diagram and the drive parameters before the engineer arrives. And agree in writing what commissioning includes and what happens if tuning runs into third-party equipment.
A competitor offers everything turnkey, including construction, while you offer only the cooling tower. How do we compare?
By the price of the entire contract and on the same scope. If our proposal covers only supply, ask us to price the work as well: foundation, crane, piping, pump station, electrical, commissioning. For this we need to visit the site; otherwise construction cannot be priced honestly. Then look at what remains with you: machinery, site access permits, access roads. And ask both who is responsible for the water temperature in summer, not just for the fact of installation. We do the installation and the work ourselves, so this entire scope can be with one contractor.
We installed silencers to meet noise requirements. Will the cooling tower cool worse?
It will, if the silencer was not taken into account at selection. It adds resistance, the fan's operating point shifts, and there is a risk of insufficient cooling in hot weather. That is why the noise requirement is needed before selection: the level in dBA and the distance at which it is specified. Then the silencer is calculated together with the fan and compared with other options. A variable frequency drive at 70% speed at night reduces noise by 7–8 dB; there are also noise-damping inserts in the basin and acoustic screens.
We will do the installation ourselves, with installation supervision from you. What does your engineer usually find?
Typical findings: the chemical tanks are not connected, the flow direction in the heat exchanger is reversed, sensors are in the wrong places, there is no standby pump. Installation supervision checks the piping, cables and sensors and gives comments before start-up, while they are cheap to fix. The engineer's trip takes from one to eight weeks.
Installation is part of our turnkey services. We will calculate a replacement or a new installation free of charge: submit a request or call +7 (800) 333-49-96.
Watch: cooling towers (in Russian)
VR-1-6-U cooling tower: customer reviewLet us size a cooling system for your site
An engineer will select the equipment and send you a calculation. Free of charge, no obligation.