Cooling solutions by industry
In brief. Cold Energy (NCT) designs and supplies cooling systems tailored to the site — cooling plants, energy centers, trigeneration, gas turbine and gas engine inlet cooling, data centers. The solutions are built on Thermax absorption chillers and NCT cooling towers, chillers and dry coolers. An engineer's consultation, layout options and a feasibility study are free.

We select a cooling system for a specific site: an industrial plant, a shopping or business center, a power plant, a data center. We work both with standard cooling plants and with complex schemes where cooling is produced from waste heat.
We join at the concept stage. Based on the input data, we choose the equipment type taking into account technical parameters, cost and operating conditions. Our solutions are built on Thermax absorption chillers, NCT cooling towers, chillers and dry coolers, and proven design schemes of global manufacturers.
Solutions by application
More applications: fertilizer plants, waste heat recovery, hot water driven cooling, reducing chiller power consumption, turnkey chiller plants, cooling systems and recirculating water systems.
Trigeneration
A cogeneration unit combined with an absorption chiller produces electricity, heat and cooling. In summer the engine heat is not wasted but used for air conditioning, so the overall efficiency of the energy complex rises to 80 % and higher.
Food production
Absorption chillers cut the cost of air conditioning and process cooling where electrical capacity is short. A hybrid plant of absorption and vapor-compression machines delivers chilled fluid below −5 °C with lower compressor power consumption.
Commercial real estate
Natural gas or hot water driven absorption chillers cover central air conditioning when grid capacity is insufficient: in new districts, energy-deficient regions, historic city centers.
Gas turbine and gas engine inlet air cooling
In hot weather a gas turbine loses output and burns more gas. An exhaust gas driven absorption chiller cools the inlet air to +15…+20 °C.
Petrochemicals
In summer, circulating water cannot cool light hydrocarbon fractions to the required 32…40 °C. An absorption chiller running on waste steam produces water colder than a cooling tower can.
Data centers and automotive plants
For data centers we design server hall cooling with N+1 or 2N redundancy, free cooling and heat recovery. For automotive plants — cooling of casting molds, welding, paint booths and shop circulating water.
Industry brochures
We have industry brochures for 50 industries, from dairies, breweries and sugar plants to airports, hospitals, ice rinks and data centers. Each one covers where the plant needs cooling and in which mode, piping schemes, answers to the procurement committee's questions and a payback calculation for a 5 MW absorption chiller plant. The brochures are in Russian; ask for the one for your industry in a request.
The guide "5 Cooling Schemes" shows how, for the same 1,000 kW cooling task, electricity costs differ by a factor of 10, with capital cost, operating cost and power for each scheme. We will send it by email or via Telegram: request it on the resource page.
How a project runs
- Engineer's consultation: we discuss the task and collect the input data.
- Concept: we choose the equipment type and the cooling scheme.
- Technical specification, layout options and feasibility study, a step-by-step work plan.
- Design — by our own design center.
- Equipment supply, installation supervision and commissioning.
- Service.
The consultation, layout options and feasibility study are free.
Frequently asked questions
When should an absorption chiller be considered instead of an electric chiller?
When the site lacks electrical capacity, has waste heat (steam, hot water, exhaust gases) or has access to natural gas. Then cooling is produced from heat and almost no electricity is used.
Do you work outside Russia?
Yes. Our projects include sites in Kazakhstan, Belarus, Uzbekistan and Armenia.
What does the free consultation include?
A conversation with an engineer, equipment layout options and a feasibility study. As a result you get a concept, a basis for the technical specification and a plan for the next steps.
Let us size a cooling system for your site
An engineer will select the equipment and send you a calculation. Free of charge, no obligation.