Frequently asked questions about working with us
In brief. This page collects answers to common questions about working with Cold Energy (NCT): who does the installation, how long a project takes, what makes up the budget, the warranty, how to verify performance, whether the calculation is free and whether you can lease. Questions about choosing equipment models and how they work are in the FAQ section on nc-t.ru.

This page answers the questions customers ask most often about working with us: who does the installation, how long a project takes, what makes up the budget, how the warranty period is counted, how to verify the stated performance, whether the calculation is free and whether you can lease the equipment. If you do not find your answer here, our engineers will review your task free of charge: send a request or call +7 (800) 333-49-96.
Questions about equipment models (which cooling tower or chiller to choose, what types there are, how they run in winter) are collected in the FAQ section on nc-t.ru (in Russian). How we integrate equipment into a system is covered on the pages "Cooling towers in turnkey projects", "Chiller-based cooling center" and "Services".
Working with us: project, timing, warranty, payment
↑ Back to the list of questions
Do you install the equipment yourselves or only supply it? Can our own contractor do the installation?
We install it ourselves, together with commissioning. If you want your own contractor to do the installation, that works too: they install, and our engineers manage the work as installation supervision and carry out the startup. Do not start the equipment yourself before our engineer arrives, or there will be a warranty dispute later. Installation supervision catches things that are easy to miss: reversed flow in a heat exchanger, wrongly placed sensors, tanks left unconnected.
↑ Back to the list of questions
What is your warranty period, and when does it start?
The standard warranty on chillers, cooling towers and dry coolers is 12 months; it is extended to up to 5 years if we do the installation or installation supervision and commissioning and you sign a service contract with us for the same period. We state the period for your machine in the proposal. We count it from commissioning, so the installation period does not eat into the warranty. You still have to store the equipment as the manual says: breaking the storage conditions voids the warranty. To avoid disputes later, keep the startup report and maintain a service log from day one. Without the log, it is hard to prove what caused a failure.
↑ Back to the list of questions
How long does the whole project take: design, supply, installation?
It depends on what you order. A pre-design study with options takes 2–4 weeks, design documentation 2–3 months, working documentation 2–4 months. Chillers and cooling towers may be in stock; if not, manufacturing takes 10–12 weeks. Thermax absorption chillers have their own lead time, which we state for each model. After installation and commissioning we run a 72-hour trial run. Count backwards from the date the site will be ready: equipment delivered earlier will simply sit there.
↑ Back to the list of questions
We need a budget for the whole project, not just the machine. What goes into it?
The machine and everything around it. A chiller costs RUB 13–30 million per megawatt of cooling, depending on the configuration. Then come pumps, tanks, controls, heat rejection, design, installation and commissioning, which we estimate for the specific site. If the site lacks electrical capacity, add the grid connection fee: RUB 50,000–200,000 per kW. For a first estimate, the capacity, temperatures and city are enough.
↑ Back to the list of questions
Is the calculation paid? We have not decided yet whether we will buy.
No. We prepare the selection, a cost estimate including delivery and installation, and the technical proposal free of charge, and you are not obliged to buy afterwards. We need a questionnaire; if some data are missing, an engineer will help you fill it in by phone or video call. We will not select equipment with no data at all: errors in the data lead to a solution that does not work. Working documentation, installation and other work are paid, and we state their price before we start.
↑ Back to the list of questions
How can we check that the equipment delivers the stated performance?
By measuring under design conditions: the specified inlet water temperature, the design flow rate, a known wet-bulb temperature. Readings taken on a cool day or without load prove nothing, so we agree in advance on how to create the load. We hand over a turnkey system after a test run, usually 72 hours under load. If you buy the parts separately, draw up a table before the design stage: who supplies, installs and sets up what.
↑ Back to the list of questions
Can we buy on lease?
Yes, through partner leasing companies. Allow time for it: the leasing company and the lawyers take more than one day to approve the deal, and the proposal is valid for a limited period. Tell us about leasing right away, because it affects how the supply is documented. You can also come to the plant for acceptance, subject to written agreement.
↑ Back to the list of questions
We are in another country, and delivery costs more than the equipment itself. Does it make sense to order from you?
It depends on the capacity. We deliver across Russia and the CIS; the modules ship as small blocks, which lowers transport costs. On small machines, delivery may still eat up the savings, and in that case we will tell you right away. Compare proposals with delivery to site, unloading and customs on one line. Give us the country, the address and the capacity, and we will calculate transport together with the equipment.
↑ Back to the list of questions
Since when has Cold Energy been in business?
Since 2011; the legal entity was registered in 2012. We have been the official and exclusive representative of Thermax in Russia and the CIS since 2011 and have manufactured our own NCT equipment since 2015.
More on the page About Cold Energy (NCT)
↑ Back to the list of questions
Where is the production?
In Sertolovo, Leningrad Region. The head office is in St. Petersburg, 44 bldg. 2, Industrialny Prospekt. A new 2.5-hectare research and production complex is being built in the Novoorlovskaya SEZ.
More on the page About Cold Energy (NCT)
↑ Back to the list of questions
Who runs the company?
CEO and owner Maxim Krasnov.
More on the page About Cold Energy (NCT)
↑ Back to the list of questions
Can one company deliver the whole project?
Yes. We handle design, manufacturing, supply, installation, commissioning and service, so one organization is responsible for the result. If needed, we also take a single stage — for example, design only or supply only.
More on the page About Cold Energy (NCT)
↑ Back to the list of questions
What documents come with the equipment? Procurement asks for certificates, a passport and a safety justification.
The equipment comes with a passport, an operating manual and TR CU declarations or certificates for the pumps, motors, compressors and heat exchangers. A safety justification is not part of the standard set. It is developed only if a hazardous production facility needs to deviate from the federal industrial safety rules or those rules are insufficient. The nameplate under TR CU 010 is metal, not a sticker. It is better to agree on the full list before the contract.
More on the page Certificates
↑ Back to the list of questions
The technical specification requires TR CU 012, but the machine stands in a category D room. Is this mandatory?
Usually not, but we decide based on the justification. The declarations for Thermax absorption chillers are issued under TR CU 004, 010 and 020, while 012 covers equipment for explosive atmospheres. Send us the basis for the requirement: the room category and the zone class. If the zone really is explosive, the design is discussed separately. It costs more, and certification is complicated: samples are needed for testing. That is why the requirement should be removed or confirmed at the technical specification stage.
More on the page Certificates
↑ Back to the list of questions
How do you confirm that a control panel meets the requirements?
With three documents: a passport, a test report to GOST IEC 61439 and a registered declaration of conformity to TR CU 004/2011 and 020/2011. On acceptance, check the declaration and report numbers, and look for the EAC mark on the nameplate or in the passport. Ask for copies together with the proposal rather than at delivery: that way you can see in advance whether the set covers the requirements of your technical specification.
Selection and calculation are free: submit a request or call +7 (800) 333-49-96.
More on the page Certificates
↑ Back to the list of questions
Can we visit the plant before signing a contract?
Yes, no contract is needed for that. We usually show customers and designers the warehouse, the welding area, cooling tower and chiller assembly and the technical inspection department; you can ask the specialists questions right on the shop floor and hold a technical meeting on the project at the same time. Arrange the visit in advance by phone at +7 (800) 333-49-96. If it is a long trip, start with the video about our production (in Russian).
More on the page Our own NCT plant in Sertolovo: what we make and how we test it
↑ Back to the list of questions
Is Russian assembly of refrigeration machines reliable?
Reliability depends on how the assembly is done, so ask about exactly that. Our frames are bolted together, the assembler works from a detailed 3D model rather than from memory, and every machine goes through the technical inspection department. We buy compressors from proven manufacturers; if you do not trust a particular brand, we will fit a compressor from another manufacturer at your request.
More on the page Our own NCT plant in Sertolovo: what we make and how we test it
↑ Back to the list of questions
Will you provide a chiller test report: relays, wiring diagram, compressor windings?
Yes, if agreed in advance. We carry out such a test with a report at the customer's request, so before testing we agree on the list: what we check and what we consider normal. This is usually relays, starters and the resistance of the compressor windings. Absorption chillers are leak-tested in a helium chamber before shipment. You can come for the acceptance: the customer's representatives, usually a power engineer, an electrician and a mechanic, come to the plant by written agreement.
More on the page Our own NCT plant in Sertolovo: what we make and how we test it
↑ Back to the list of questions
Will factory testing confirm the rated capacity of a cooling tower?
No. At the plant, the air flow is measured in dry running, along with the motor currents and the fan speed; the thermal capacity can only be seen under load at the site. In international practice, acceptance tests are carried out to the CTI ATC-105 code within 12 months of operation, after at least 1,000 hours of running, at design conditions: flow rate, inlet temperature and a known wet-bulb temperature. If testing matters, agree right away on who carries it out and how the load is created.
More on the page Our own NCT plant in Sertolovo: what we make and how we test it
↑ Back to the list of questions
How is a chiller packed, and how do you check that it arrived undamaged?
We design the packaging for the weight, center of gravity, design and mode of transport. Chillers and closed-circuit cooling towers travel with the circuit under pressure:
- On acceptance, check the circuit pressure with a pressure gauge.
- If there is no pressure, draw up a report with photos and video and notify us.
- For delivery in covered transport, sign only for the quantity before unloading, and for the quality after it.
For safe unloading, we will provide a spreader beam on request.
Selection and calculation are free: submit a request or call +7 (800) 333-49-96.
More on the page Our own NCT plant in Sertolovo: what we make and how we test it
↑ Back to the list of questions
How do I get an equipment quote?
Send the input data of your site to info@colden.ru or call +7 (812) 332-53-66: an engineer will get in touch, clarify the data and send you an equipment selection and the cost. It is free.
More on the page Contacts
↑ Back to the list of questions
Installation and service
↑ Back to the list of questions
How many days in advance should we call your specialists for commissioning, and what must be ready when they arrive?
As early as possible: we agree on the date based on the service team's workload, and the most start-ups happen before summer. For a water-cooled chiller with a cooling tower we come once, because they have to be checked together. By the time we arrive, you need a stable power supply, water in the circuit, the design flow rates, a heat load and above-zero temperatures in the rooms. Power outages during start-up are dangerous for the equipment, so we record such events in a letter, with dates. Specify in advance what stock of spare parts you want to receive at start-up.
More on the page Chiller installation
↑ Back to the list of questions
Why does installation cost this much? Others quote two and a half times less. Is installation 10% of the equipment cost or 30%?
There is no such percentage: the price depends on the plant, the length of the piping run, the tie-in with the existing system and whether structures are needed. Put the two estimates side by side and compare the lines: crane and rigging, steel structures, insulation, controls, testing. See who is responsible for reaching the temperature. If a difference remains, we will go through the estimate together, and we may turn out to be more expensive. We do not estimate installation from a video: a site visit is needed for the calculation.
More on the page Chiller installation
↑ Back to the list of questions
We have our own installer. Can we remove installation supervision and commissioning from the price to stay within budget?
We do the installation ourselves, but if you want your own installer to do it, installation supervision can be removed. Keep chiller commissioning in the scope of work. Without tuning, the machine will not reach its parameters, and if the chiller arrived without a factory refrigerant charge, the refrigerant is charged precisely at this stage. Keep the warranty in mind too: we give the extended chiller warranty, up to 5 years, when we carry out the installation or the installation supervision and commissioning and a service contract is signed with us; otherwise the standard 12 months applies. Without installation supervision, your installer is responsible for the piping, and mistakes will surface in the finished system. The price of installation supervision depends on its duration: the trip takes from one to eight weeks, so with an experienced installer try to shorten the period first.
More on the page Chiller installation
↑ Back to the list of questions
During pressure testing of a system installed by our contractor, the pressure drops. Who sorts it out: the contractor or the supplier?
First the installer and the customer find the leak, and only then is it clear whose case it is. More often it is an installation joint that leaks rather than the factory piping, and then the installer fixes it. If the leak is in a factory assembly, the supplier decides after an inspection. Photograph the spot, note the serial number and send them to the service team. Do not charge the system until it has been tested again.
More on the page Chiller installation
↑ Back to the list of questions
At start-up the flow does not reach the design value. Is the pump too small or is the chiller to blame?
First check the filters: sometimes they were not flushed and checked after testing, although cleaning the filter elements is part of pipeline testing under SP 73.13330.2016 (Russian building code). Next we look at the dirt separator, air in the circuit and the position of the balancing valves, then the pressure drop across the evaporator. Specify flushing in the installer's scope in writing in advance: then it is clear who fixes it.
More on the page Chiller installation
↑ Back to the list of questions
We want to put the chiller inside the workshop so the installation is not outdoors. Will a packaged unit work?
An air-cooled packaged unit is cheaper and more compact, but inside a building it needs ventilation: the condenser heat has to go somewhere. If it cannot be released into the workshop, we use a remote-condenser chiller, with the unit indoors and the condenser on the roof, or a water-cooled chiller with a cooling tower. Which option is cheaper to install becomes clear after a site survey.
Installation is part of our turnkey services, and after start-up the machine is maintained by our chiller repair service (in Russian). We will calculate the scope of work free of charge: submit a request or call +7 (800) 333-49-96.
More on the page Chiller installation
↑ Back to the list of questions
We are handing over the facility in winter and there is no heat load. Can the cooling tower be commissioned?
It can, by agreement, but this is a check of the settings and of how the components work, not a confirmation of cooling. Capacity cannot be seen this way. So in the annex to the certificate we record right away what has been checked and what remains: makeup water, the sensor range in the frequency converter, the external control signal. The parameters are confirmed separately under design conditions: the specified inlet water, the design flow rate, a known wet-bulb temperature. Agree in advance when the load will appear and who will come to take the measurements.
More on the page Cooling tower installation and replacement
↑ Back to the list of questions
We will weld nozzles and flanges to the cooling tower casing on site. What can go wrong?
Welding damages the protective zinc layer, and corrosion starts from that spot. That is why it is better to order the flanges as a factory kit: they are welded to the nozzles and hot-dip galvanized at the plant. This is an option; it is included in the design from the start, and later it will no longer help. The same goes for a rooftop service platform: the standard one requires drilling into the structures. If drilling is not allowed, we develop a custom one; for this we need data on the load-bearing structures and the elevation mark.
More on the page Cooling tower installation and replacement
↑ Back to the list of questions
Can we put our own control panel and VFD on the cooling tower and order only commissioning from you?
You can, but agree in advance who is responsible for what. With someone else's panel and VFD, tuning may run into the drive parameters, and then the scope and payment for commissioning become disputable. So send the panel diagram and the drive parameters before the engineer arrives. And agree in writing what commissioning includes and what happens if tuning runs into third-party equipment.
More on the page Cooling tower installation and replacement
↑ Back to the list of questions
A competitor offers everything turnkey, including construction, while you offer only the cooling tower. How do we compare?
By the price of the entire contract and on the same scope. If our proposal covers only supply, ask us to price the work as well: foundation, crane, piping, pump station, electrical, commissioning. For this we need to visit the site; otherwise construction cannot be priced honestly. Then look at what remains with you: machinery, site access permits, access roads. And ask both who is responsible for the water temperature in summer, not just for the fact of installation. We do the installation and the work ourselves, so this entire scope can be with one contractor.
More on the page Cooling tower installation and replacement
↑ Back to the list of questions
We installed silencers to meet noise requirements. Will the cooling tower cool worse?
It will, if the silencer was not taken into account at selection. It adds resistance, the fan's operating point shifts, and there is a risk of insufficient cooling in hot weather. That is why the noise requirement is needed before selection: the level in dBA and the distance at which it is specified. Then the silencer is calculated together with the fan and compared with other options. A variable frequency drive at 70% speed at night reduces noise by 7–8 dB; there are also noise-damping inserts in the basin and acoustic screens.
More on the page Cooling tower installation and replacement
↑ Back to the list of questions
We will do the installation ourselves, with installation supervision from you. What does your engineer usually find?
Typical findings: the chemical tanks are not connected, the flow direction in the heat exchanger is reversed, sensors are in the wrong places, there is no standby pump. Installation supervision checks the piping, cables and sensors and gives comments before start-up, while they are cheap to fix. The engineer's trip takes from one to eight weeks.
Installation is part of our turnkey services. We will calculate a replacement or a new installation free of charge: submit a request or call +7 (800) 333-49-96.
More on the page Cooling tower installation and replacement
↑ Back to the list of questions
Will you sell spare parts or new fill for a cooling tower from another manufacturer? And can you install them yourselves?
We sell spare parts. For Evapco, Decsa and Baltimore closed-circuit cooling towers, we make replacement heat exchanger coils. For other makes, send the tower model and the dimensions of the old part. We do not repair or provide scheduled maintenance for other manufacturers’ towers. Your contractor or maintenance team installs the part. To size a complete replacement NCT modular tower, we need the water flow rate, inlet water temperature, heat load, design wet-bulb temperature and available footprint.
More on the page Cooling tower maintenance and repair
↑ Back to the list of questions
The make-up water is softened and the hardness is zero. There is no scale, so the water is fine?
No. Softening replaces the hardness salts with sodium salts but does not lower the total dissolved solids. With zero hardness, the alkalinity and dissolved solids in the circuit easily exceed the manufacturer's limits. Chemicals do not cure this; acid only trades one exceedance for another. Dissolved solids are reduced by membranes: make-up from reverse osmosis with a small admixture of softened water, because pure water after reverse osmosis is aggressive to copper. A water quality log is also needed.
More on the page Cooling tower maintenance and repair
↑ Back to the list of questions
Should water be drained from the basin for the winter and the cooling tower covered?
While the cooling tower is running, there is no need to drain it: the water circulates and receives heat from the process. A shutdown is what is dangerous. If the basin has a heater, the water can be left in, but the outdoor pipes and pump piping are still drained or heat-traced. Basin heating does not protect the pipes, and without water it will not switch on: the level sensor blocks it. Without heating, during a long shutdown the water is drained according to the manual for your model. There is no need to cover the cooling tower; covers are not provided for it.
More on the page Cooling tower maintenance and repair
↑ Back to the list of questions
The cooling tower iced up in winter, or the heat exchanger of a closed-circuit cooling tower froze. Is this a warranty case?
As a rule, no. Icing caused by winter conditions is not covered by the warranty, and after the heat exchanger freezes, the closed-circuit cooling tower is taken off warranty. We still check the cause of icing with a site visit by a specialist: most often the heat load does not match the settings, and on fan-assisted cooling towers the problem is solved by variable frequency control of the fans. If operation will be in winter and intermittent, the type of cooling tower is best discussed at the selection stage.
More on the page Cooling tower maintenance and repair
↑ Back to the list of questions
The float of the level sensor sticks, and the make-up water flows on and off. What should we do?
Replace the float sensor with a sensor that has no moving parts. A hydrostatic sensor sits in the water and measures the level by the pressure of the liquid column; there is nothing in it to stick. We have already made this replacement on operating cooling towers. At the same time, check the make-up valve: its voltage must match the panel diagram, otherwise the valve may fail right after start-up. Until the sensor is replaced, watch the level in the basin: without make-up, the pumps will stop.
More on the page Cooling tower maintenance and repair
↑ Back to the list of questions
A fan bearing seized on the cooling tower, and the fan wheel itself broke. Why does this happen?
From our investigations, the cause is usually lubrication. There is too little of it or it is the wrong kind: friction increases, the bearing overheats and seizes, and the rotation is transmitted further to the shaft, the wheel and the casing. Use only water-resistant grease with a corrosion inhibitor, and take the interval from the data sheet of the model. On some belt-driven units it is shorter. A high-pressure grease gun tears the seals. Vibration diagnostics reveals the defect in advance: pitting on the ring is visible before the bearing seizes.
Cooling tower maintenance and repair is part of our service; chillers at the same plant are covered on the Chiller repair (in Russian) page. Send us the cooling tower type, the flow rate and what is wrong — submit a request or call +7 (800) 333-49-96.
More on the page Cooling tower maintenance and repair
↑ Back to the list of questions
Engineers travel from another city, and service ends up expensive. How can this be reduced?
Cut out unnecessary trips. With your consent, the equipment is connected to the control room over a secure channel, and some issues are resolved remotely. An extended spare parts kit for your warehouse can be included in the delivery; then the engineer does not wait for parts and travels once. We can also train your specialists or a local service company; training is paid. Scheduled work is conveniently combined into one visit.
More on the page Cooling equipment service
↑ Back to the list of questions
What is not covered by the warranty? We thought everything had to be repaired free of charge.
The exact list is in your contract, but the warranty usually does not cover violations of the installation and operating instructions, or a fault that cannot be reproduced or is cleared by adjustment, cleaning or maintenance. Foreign objects, weather, birds and power supply outside GOST are not covered. Without a photo of the nameplate and the documents, the case will not be considered. If a case turns out not to be covered by the warranty, we offer paid diagnostics or repair. Disputed cases are reviewed based on photos, the log and measurements.
More on the page Cooling equipment service
↑ Back to the list of questions
Who pays for the call-out if the case turns out not to be covered by the warranty?
The customer: a non-warranty case is paid in full, including the call-out. To avoid a wasted trip, first send a description, photos and video of the defect, a photo of the nameplate and the maintenance log: some cases can be resolved from these or remotely. If the fault is cleared by adjustment or cleaning, this is usually not a warranty case either. The scope and cost of work are agreed before we start.
More on the page Cooling equipment service
↑ Back to the list of questions
We want to maintain the equipment ourselves. What happens to the warranty?
You can do scheduled work yourselves after training, if the contract allows it and you keep a maintenance log. Repairs are different: if the customer repairs the equipment themselves, the warranty on that equipment is void. So if there is a fault, notify us in writing first. Check your tools as well: you need, for example, ultrasonic flow meters. If you lack the expertise, the service team will take on the tuning of controllers and of pressure and temperature control, and will teach your people to work with the controls.
More on the page Cooling equipment service
↑ Back to the list of questions
What documents are needed for a warranty claim to be considered at all?
A letter with a description, a defect report, photos and video of the defect, a photo of the nameplate with the serial number, the installation and commissioning certificate, and the maintenance log. Photos of the motor and measurements of currents and resistance are often requested as well. The review period starts from the complete package, so one missing document delays the answer. Keep the log from day one: without it, disputing the cause of a failure is hardest. Send the letter as soon as you find the defect; after that, running the faulty machine is at your own risk.
More on the page Cooling equipment service
↑ Back to the list of questions
Another company commissioned the system: the absorption chiller gives half its capacity, and the cooling tower runs at 40%. Can you restore it?
If the equipment is NCT or Thermax, yes. First our specialist inspects the site. The restoration work is arranged under a separate service contract, and the scope often includes the water treatment panels and pumps. The visit date is agreed in advance, because the plant is shut down for the duration of the work.
Need service or a system survey? Submit a request or call +7 (800) 333-49-96.
More on the page Cooling equipment service
↑ Back to the list of questions
Cooling towers and recirculating water
↑ Back to the list of questions
Our specification calls for 25 °C water in summer at a 22 °C wet bulb. Why do you say this is unrealistic?
Because it is almost the limit of physics: water from a cooling tower is never colder than the wet-bulb temperature. An open tower realistically delivers 3–5 °C above it, a closed-circuit tower 5–8 °C: here that means 25–27 and 27–30 °C. If someone guarantees 25 °C, ask for a printout of the selection with the design point. There are two honest options: agree on warmer water, or install a chiller after the cooling tower to cover only the hot hours.
More on the page Cooling towers as part of a turnkey cooling system
↑ Back to the list of questions
We have been quoted a cooling tower several times cheaper than yours. Why such a difference?
Most often the quotes were for different tasks, so first compare the selection conditions: flow, water temperatures, design wet bulb and its exceedance probability. If they are not in the proposal, the price means nothing. Next comes the margin: a cooling tower that delivers water 3 °C above the wet bulb must be roughly 2.2 times more powerful than one that delivers 6 °C above it. Then the scope: variable frequency drives, controls, water treatment, commissioning. With foreign proposals, ask separately about heat exchanger pressure testing, documents in Russian and who will come out in case of failure.
More on the page Cooling towers as part of a turnkey cooling system
↑ Back to the list of questions
Why do you need a water analysis before the contract? Install the station, and we will choose the chemicals later.
Because the water treatment panel and the chemicals are selected based on a make-up water analysis, not a standard list. The water composition determines how many cycles of concentration can be held, and therefore how much water will go to make-up and blowdown. Without an analysis, the proposal will include only the monitoring and dosing station. A closed-circuit cooling tower needs one too: the spray water evaporates and salts build up. Also find out the conditions for discharging blowdown to the sewer before the design stage.
More on the page Cooling towers as part of a turnkey cooling system
↑ Back to the list of questions
Can a modular cooling tower replace an old field-erected one, on the same basin?
As a rule, yes, but we decide this after a site visit, not from the old design. If the cooling tower has long been falling short of capacity, the old flow should not be used: the load may have changed over the years. We will need as-built diagrams of the cooling water system and the tie-in points, the controls diagram, a site plan with access roads and space for a crane, height and noise restrictions, and the site access procedure. We check the basin and foundation separately as a base for the new modules.
More on the page Cooling towers as part of a turnkey cooling system
↑ Back to the list of questions
The cooling tower will stand one meter from a building wall, and there is nowhere to raise it. Is this a problem?
Yes, if it is not taken into account in the selection. Next to a wall, the cooling tower starts drawing in its own warm, humid discharge air. Under SP 60 (Russian building code), on a flat roof with walls closer than 3 m, another 3 °C is added to the design wet bulb, and a rise of 2–4 °C due to such recirculation costs 10–15 % of capacity. So we size the cooling tower with a correction and look at how to direct the discharge away: a high-pressure centrifugal fan helps here. In winter, the humid discharge will also go onto the wall.
More on the page Cooling towers as part of a turnkey cooling system
↑ Back to the list of questions
Which water cooling system should we choose: a cooling tower, a dry cooler or a chiller?
It depends on the temperature the process requires and whether makeup water is available on site. A comparison for summer at a wet-bulb temperature of 22 °C:
| Scheme | Makeup water | What the process gets in summer | When we use it |
|---|---|---|---|
| Open cooling tower | for evaporation, drift and blowdown | wet bulb + 4–5 K, about 26–27 °C | the water tolerates contact with air, large flows |
| Closed-circuit cooling tower | only for the spray water | 27–28 °C | a clean loop or glycol is needed |
| Open cooling tower + heat exchanger | same as open | 28–30 °C | very large flows, an open cooling tower is already in place |
| Dry cooler | not needed | 5–11 K warmer than the outdoor air | no water or discharge available, hot water |
| Dry cooler or cooling tower + chiller | same as the chosen cooler | any temperature the chiller can hold | the process needs colder water than the weather provides |
If the process engineer needs 25 °C at a wet bulb of 22 °C, no scheme without a chiller will deliver it reliably: either the setpoint is agreed at 27–28 °C, or a chiller provides additional cooling. Closed-loop schemes are covered in detail in the article "Closed-loop water cooling system" (in Russian).
More on the page Turnkey water cooling and recirculating cooling water systems
↑ Back to the list of questions
Can we fill the loop of a closed-circuit cooling tower with ordinary tap water?
Only after a water analysis. With tap water, the heat exchanger can corrode from the inside, especially in the upper, hotter part. Two causes are usually looked for: high dissolved oxygen and stray currents. This can be checked by analysis and on-site measurements. To avoid disputes later, agree on the requirements for the loop medium, including oxygen, right away. We protect the coils with hot-dip galvanizing, but it does not replace water monitoring.
More on the page Turnkey water cooling and recirculating cooling water systems
↑ Back to the list of questions
Our water comes from a well. Can we do without water treatment for now?
Better not to put it off: on hard well water, cooling towers have failed within a year. Salts clog the fill and filters and damage the pumps, and deposits on screens and heat exchangers reduce performance by up to 20%. Start with an analysis of the well water: a dosing station is installed where the water quality requires it, not automatically on every cooling tower. If the budget for the station comes later, reserve the space and connections for the panel right away.
More on the page Turnkey water cooling and recirculating cooling water systems
↑ Back to the list of questions
Can we do without makeup, or feed makeup to the cooling tower through the water distribution system by adjusting the pump?
No. Water physically leaves through evaporation, drift and blowdown, and the pump only circulates what is already in the loop. Makeup is fed through a separate line into the basin with an air gap so that loop water cannot flow back into the water supply. The level is held by a valve with a level switch or a float. Without makeup, the level drops and the pumps trip on protection. If the cause is a lack of water on site, we work out a different scheme; adjusting the pump will not help here.
More on the page Turnkey water cooling and recirculating cooling water systems
↑ Back to the list of questions
Is Legionella a danger in a wet cooling tower, and what should be done about it?
The risk exists, and the regulations recognize it: SanPiN 3.3686-21 classifies cooling towers as potentially hazardous and requires periodic water testing. Legionella thrives at 25–45 °C, which is the normal operating range. Nobody achieves zero drift, so water treatment with a biocide and a monitoring plan are needed. Before the season, shock disinfection is carried out: free chlorine at 4–5 mg/L at pH 7.0–7.6, held for about 6 hours. Above 100 CFU/mL, hyperchlorination, cleaning and a repeat analysis are needed.
More on the page Turnkey water cooling and recirculating cooling water systems
↑ Back to the list of questions
What is the warranty on the system, and does the extended warranty remain if another company services it?
The standard warranty is 12 months. With our installation and a service contract, it is up to 5 years, and 10 years against through-corrosion. The extended warranty depends on the service contract: if another company services the system, it does not apply. So it is better to settle the service question before the supply contract, not after start-up.
If the water needs a lower temperature than the cooling tower can provide, the recirculating loop becomes part of a cooling system with a chiller or a lithium bromide absorption chiller, and we handle that too, from design to service.
Selection and water balance calculation are free of charge. Send us the heat load, flow rate and water analysis: send a request or call +7 (800) 333-49-96.
More on the page Turnkey water cooling and recirculating cooling water systems
↑ Back to the list of questions
Absorption chillers
↑ Back to the list of questions
The system was commissioned by a third-party company. The absorption chiller delivers half its capacity, and the cooling tower runs at 40%. Can you restore it?
Yes, if the machine is a Thermax: we do not repair other brands. We start with an on-site inspection. We look at the whole chain: flows and temperatures in the circuits, control panels, water treatment pumps, the water and a solution sample. The cause often lies around the machine rather than in it. The scope of work is determined based on the inspection; a non-warranty case, including the site visit, is paid for by the customer. We agree on the visit date in advance: the plant may be shut down for the duration of the work. Have the fault log and the start-up report ready, if there is one.
More on the page Buy a Thermax absorption chiller: a turnkey absorption chiller plant
↑ Back to the list of questions
Your absorption chiller is the most expensive of three offers. What am I paying for?
First, check whether the inputs match: chilled water temperatures, cooling tower water, heating medium parameters, the lower load limit. Three offers are rarely calculated for the same operating mode. Then compare the coefficient of performance and the price of 1 kWh of cooling in rubles on your heat, not the price of the machine. Find out whether the solution, installation supervision and commissioning are included, who does the analyses and where the spare parts come from. If another machine is cheaper with equal inputs, we will say so directly.
More on the page Buy a Thermax absorption chiller: a turnkey absorption chiller plant
↑ Back to the list of questions
We need a 1 MW absorption chiller, with commissioning and delivery. Do you have one in stock?
As a rule, no: the factory makes the machine for your operating mode, and it usually cannot be supplied from stock. This applies especially to non-standard tasks, for example water at about +3 °C from hot water: a different tube material may be needed there, and that affects the price and weight. So build the lead time into the project plan in advance; we will give the exact date for the specific model.
More on the page Buy a Thermax absorption chiller: a turnkey absorption chiller plant
↑ Back to the list of questions
The absorption chiller trips, and the staff reset it and cut power to the control panel. What can this lead to?
Machine failure. If the burner runs without control from the automation, no one watches the signals, and running equipment is de-energized to clear the alarm, the safety rupture disc may burst and the shell will lose its tightness. The machine can ride through a power dip of up to 3 minutes; longer than that, a dilution cycle is needed, otherwise crystallization is possible. That is why a UPS or a backup power feed is provided, and staff are trained to read the log. A recurring fault is passed to the service team, not reset.
More on the page Buy a Thermax absorption chiller: a turnkey absorption chiller plant
↑ Back to the list of questions
There is not enough electrical capacity on site. Which is cheaper: buying more or installing an absorption chiller?
Calculate both lines; the grid connection fee often settles the argument. It costs from RUB 50,000 to 200,000 per kW. A compressor station needs about 300 kW per megawatt of cooling, a hot water driven absorption station 15–30 kW. On the connection alone, the difference comes to roughly RUB 14–57 million, one-off. This works if there is cheap heat and the machine runs enough hours. The absorption chiller does not cover the rest of the load growth: it only takes the cooling off the grid.
More on the page Buy a Thermax absorption chiller: a turnkey absorption chiller plant
↑ Back to the list of questions
Chillers and chiller plants
↑ Back to the list of questions
We want the energy center and the chiller plant from one company, so we don't have to figure out who is to blame. Will you take on the whole job?
We take on the chiller plant in full: design, equipment, installation, start-up and service. The gas engine part we discuss site by site. There is one condition: a signed technical specification with the scope boundaries and input data. Without it, split decisions raise the risk of errors at start-up, and rework costs more. Decide right away who gets the design approved by the fire authorities and the regulator, and who is responsible for cooling if the energy center does not supply enough heat. We will need the heat balance and the load profiles.
More on the page Turnkey chiller plant
↑ Back to the list of questions
It is easier for our budget to split the procurement: equipment separately, installation and controls separately. Is that possible?
It is, but the interface will have to be closed on paper. Before design, draw up a scope of supply matrix: for each item, who supplies it, who installs it, who connects it and who sets it up. Without it, a valve or a cable easily ends up belonging to no one, and this surfaces at start-up, when fixing it costs the most. Decide separately who is responsible for the final water temperature: with split procurement, this line is often left unwritten.
More on the page Turnkey chiller plant
↑ Back to the list of questions
Our operations team requires that a scheme with an absorption chiller have no more equipment than one with a chiller. Is that realistic?
Counted honestly, no: the absorption scheme has a longer list. A heating circuit with a control valve appears, and the cooling tower gets larger because it rejects both the cooling load and the supplied heat. Some items drop out: there are no large compressors, no oil system and no refrigerant. So compare not the length of the list but what will actually need maintenance: the water in the circuits, the solution and the inhibitor. With a backup chiller in case the heat source stops, the list grows further.
More on the page Turnkey chiller plant
↑ Back to the list of questions
We don't want to build a building for the chiller plant. Can we install the absorption chiller on an open site?
No, if the machine will spend the winter in freezing conditions: it needs a positive ambient temperature around it, not below +5 °C. A permanent building is not required, though. Usually the absorption chiller, the pump station and the control panel are assembled in one module, often in a light sandwich-panel building, or in a containerized unit. A gas-fired machine also needs a room that meets boiler house codes and gas monitoring. The cooling towers stay outside. We take the machine's weight into account at an early stage: the foundation and the lifting depend on it.
More on the page Turnkey chiller plant
↑ Back to the list of questions
The grid will not give us the electrical capacity for chillers. Will free cooling solve this?
It will lower the bill, not the capacity. In our calculation for 1,000 kW of cooling in Cherepovets, free cooling (in Russian) reduces annual electricity costs by almost half, but about 340 kW still has to be connected to the grid: in summer the compressors run at full load. A different scheme reduces the connected power. A water-cooled chiller with an open cooling tower draws about 190 kW instead of 333 kW for an air-cooled packaged unit, and an absorption chiller on waste steam about 60 kW for the pumps. So tell us the power limit on your site before the scheme is chosen.
The chiller plant is the heart of a facility's cooling system and part of our industry solutions. We will survey the site and select a scheme free of charge: submit a request or call +7 (800) 333-49-96.
More on the page Turnkey chiller plant
↑ Back to the list of questions
Can the condenser go on the roof and the unit in the basement?
Yes. If the condenser is on the roof, a large rise requires oil traps on the riser and an oil return calculation. If the condenser is below the unit, the limits are usually stricter: liquid refrigerant has to be lifted to the unit. The height difference and piping length go into the selection data sheet before selection, not after. So do the required cooling, water temperatures, site climate and noise limits.
More on the page Chiller with a remote condenser: when to use it and what to calculate
↑ Back to the list of questions
Is glycol needed if the condenser is outdoors?
Not always. If the consumer's water is not colder than +6 °C and its pipes run only through heated rooms, the loop can be water. Glycol is needed below +6 °C, for free cooling through a dry cooler, or if water pipes pass through cold areas.
More on the page Chiller with a remote condenser: when to use it and what to calculate
↑ Back to the list of questions
Who installs the refrigerant piping and is responsible for it?
The piping is part of the refrigerant circuit, and the compressors depend on it. If the piping and the machine come from different contractors, warranty disputes after a compressor failure drag on. So it is better to order the machine, the piping and commissioning from one contractor. We install ourselves and see the project through to start-up.
More on the page Chiller with a remote condenser: when to use it and what to calculate
↑ Back to the list of questions
Can an old remote-condenser machine be replaced without changing the piping?
Sometimes. The old piping is checked for diameters against the new model, for the working pressure of the new refrigerant (for R410A it is about 1.6 times higher than for R22), for tightness and for cleanliness: residual mineral oil from R22 is not compatible with the POE oil used with R410A. If it does not fit, sections are replaced. The decision is made after an on-site survey.
Select a remote-condenser chiller for your site
More on the page Chiller with a remote condenser: when to use it and what to calculate
↑ Back to the list of questions
How much does a megawatt of cooling cost? I need a range for management.
From RUB 13 to 30 million per megawatt of cooling, depending on the configuration. We can give a more precise figure once the capacity and temperatures are known, even preliminary ones: an air-cooled packaged unit and a machine running on cooling tower water cost differently. We do not price installation as a percentage of the equipment: it depends on the length of the piping runs, integration with the system and the structures. And show management a second figure: the machine itself is 5–15% of the cost of cooling over 15 years.
More on the page Chiller plant: from calculation to service
↑ Back to the list of questions
Maybe we don't need a chiller at all and a cooling tower will do?
It will, if the process can use water 3–5 °C warmer than the wet-bulb temperature. For most regions of Russia, that means a setpoint from 25 °C. Electricity costs in this mode are roughly 10 times lower than for a chiller doing the same job. If you need colder water, the chiller stays, but a water-cooled machine still needs a cooling tower: it removes heat from the condenser, and without it the machine will not run. If there is no water on site, we calculate a dry cooler: it uses no water, but in hot weather it delivers warmer water.
More on the page Chiller plant: from calculation to service
↑ Back to the list of questions
The water comes in at 30–35 °C, and when heated, even 50–60. Why can't a chiller take it directly?
Because a compressor cannot be selected for such temperatures in the evaporator: NCT machines deliver water or glycol from −18 to +20 °C. Hot water is cooled in two stages, with the circuits separated by a heat exchanger. First a cooling tower or dry cooler removes the heat, and the chiller takes care of the last few degrees. On a drop from 80 to 15 °C, the cooling tower removes about 75% without a compressor, and the chiller comes out 3–4 times smaller.
More on the page Chiller plant: from calculation to service
↑ Back to the list of questions
The furnace heats up for hours, then cools down sharply: the chiller will run for five minutes and stand idle. Can it handle that?
Not without a tank. Frequent starts eat up compressor life; many machines allow no more than two starts per hour. Taking a bigger machine will not help: it will go into even shorter cycles. The scheme that works is different: the chiller steadily builds up chilled water in a tank, and the peak is taken from the tank. The volume is calculated from the smallest capacity step of the machine and the circuit volume. The tank is placed so that the flow passes through it, otherwise it barely works.
More on the page Chiller plant: from calculation to service
↑ Back to the list of questions
The water in our loop is not perfectly clean. Won't a plate evaporator clog?
It can, so we discuss water quality before selection. If there is no certainty that the water will stay clean, we fit a shell-and-tube evaporator: it can be cleaned, although it usually costs more than a plate one. A plate evaporator is for clean water. If you need water below +5 °C at the outlet, we calculate glycol right away: on plain water in that mode the risk of freezing the heat exchanger is high.
More on the page Chiller plant: from calculation to service
↑ Back to the list of questions
We want to put a packaged chiller inside the workshop so we don't have to install it outdoors. Is that possible?
No, unless the workshop has powerful ventilation. An air-cooled packaged unit rejects heat straight into the room: about 1.25 kW for every kilowatt of cooling. For 500 kW of cooling, that is more than 600 kW of heat into the workshop. For indoor installation, use a machine with a remote condenser outdoors or with a water-cooled condenser and a cooling tower. Above residential and office spaces, such a machine is put on spring isolators; rubber does not stop the vibration there.
More on the page Chiller plant: from calculation to service
↑ Back to the list of questions
How is a cooling system different from air conditioning?
Air conditioning is one of the consumers of cooling. A cooling system prepares chilled water or glycol and distributes it to all consumers at once: air handling units and fan coils, machine tools, reactors, server rooms. That is why it is sized for the total load of the plant or building, with redundancy and a winter mode, rather than for a single room.
More on the page Turnkey cooling systems
↑ Back to the list of questions
How much electricity does free cooling save?
It depends on the water temperature and the climate. In Moscow, the wet-bulb temperature stays below 5 °C for 4,696 hours a year, more than half the year. For 1 MW of year-round load, that is up to 1.78 million kWh a year that the compressors do not consume. Thresholds and schemes are in the article "Free cooling in industry" (in Russian).
More on the page Turnkey cooling systems
↑ Back to the list of questions
The design is good, but there is no money for the whole system this year. Can we do it in phases?
Yes, if you split it into phases from the start. First the design and whatever is expensive to redo later: space for the next machines, headers with capped branches, spare room in the control panel. We start up the first phase for the current load and connect the following ones without major rework. Ordering the design, equipment and installation piecemeal from different contractors, on the other hand, ends up more expensive: the corrections fall on you. A pre-design study with options also helps defend the budget for the next cycle.
More on the page Turnkey cooling systems
↑ Back to the list of questions
Which outdoor air temperature should be used in the calculation? Determine it yourselves from your climate data.
We will, but you confirm the figure in the specification, because it determines what happens in hot weather. We start with SP 131.13330 (Russian building code), then look at long-term hourly data and the site itself: a calculation based only on the code's design points can leave the system 20–30% short of capacity in summer. For critical processes we take a higher temperature. Do not understate the humidity either: selection for dry air comes out cheaper but may not cope in summer. What happens above the design point we record separately.
More on the page Turnkey cooling systems
↑ Back to the list of questions
Operating points may change after the design. How will this affect the price?
It will, if the condition was not agreed in advance. A changed pump operating point may require a different pump, and a changed operating point of the whole system may affect other equipment too. So we agree in advance which parameters are the baseline, what tolerance is included in the price and how we recalculate. Changes are easier to make before manufacturing starts; after that it means reworking finished assemblies.
More on the page Turnkey cooling systems
↑ Back to the list of questions
The price went up while we were getting the lease approved. Can you keep the price from the first proposal?
Not always. Some components are tied to exchange rates, and the price may change during the approval period. To avoid this, check the validity period of the proposal and allow time for the leasing company and the lawyers: a long approval process is what eats up the first price. If the proposal is about to expire, write to us in advance: we will check the price before the leasing company issues its documents.
More on the page Turnkey cooling systems
↑ Back to the list of questions
Which is better in terms of investment and operation: open cooling towers, closed-circuit cooling towers or adiabatic dry coolers?
In terms of investment, an open cooling tower is almost always cheaper. In terms of operating costs, everything depends on the price per cubic meter of water. For a 5,000 kW data center, the wet scheme saves about 13.8 kWh per cubic meter, so at RUB 10/kWh it pays off as long as water costs less than RUB 138. If make-up and discharge are expensive or not available, a closed circuit and a dry cooler are compared over 15 years. Over a short period, the cheap option wins; over a long period, it is often the other way around.
More on the page Reducing Chiller Power Consumption
↑ Back to the list of questions
Will a chiller without a variable frequency drive on the compressor do if the technical specification calls for smooth control?
First ask the author of the specification what they meant: a variable frequency drive or a control range. These are different requirements, and the dispute is best settled in writing before the contract. In terms of money, look not at the data sheet but at the part-load conditions: according to IPLV, a machine runs at half load 45% of the time and at full load only 1%. So compare the annual consumption in kWh under the same selection conditions.
More on the page Reducing Chiller Power Consumption
↑ Back to the list of questions
We want to replace only the compressor or the heat exchanger, not the whole unit. Will electricity costs decrease?
Hardly, if the scheme stays the same. Take a 1 MW load, 4,380 hours per year and RUB 10/kWh: even a new machine of the same type will save about RUB 0.4 million per year, while moving from air cooling to a centrifugal machine with a cooling tower will save about RUB 7.3 million. The money lies around the unit: free cooling (in Russian), variable frequency drives, clean water. On NCT and Thermax machines, the repair itself may be quite reasonable if a fault inspection confirms it; we do not repair other brands.
We will calculate the system for your facility free of charge: submit a request or call +7 (800) 333-49-96.
More on the page Reducing Chiller Power Consumption
↑ Back to the list of questions
Dry coolers
↑ Back to the list of questions
A dry cooler is a simple thing, and Chinese suppliers quote several times cheaper, in stainless steel too. How come?
Often different units are being compared, although at small capacities the difference can be real. Ask them for a printout of the selection: design air, glycol type and concentration, noise, fan brand. On stainless steel, ask what exactly is made of it: the tubes, the fins or only the frame. Then ask about pressure testing of the heat exchanger, documents in Russian and who will come out if there is a leak. If the specification allows any unit and a shutdown is not a problem, the cheap option may be reasonable.
More on the page Buy an NCT dry cooler from the manufacturer
↑ Back to the list of questions
We want only a copper-aluminum heat exchanger. Why do you offer a microchannel one?
Because for your task it may turn out more compact and cheaper, but the decision is yours. There are two conditions: agree on the minimum operating temperature, and with spray water, check the water in advance; it is better to take samples before the contract. If copper and aluminum are written into the specification or your maintenance team is used to them, say so right away: we calculate to the specification, without pushing anything. Compare the options at the same operating point and with the same cleaning requirements.
More on the page Buy an NCT dry cooler from the manufacturer
↑ Back to the list of questions
Can the capacity be split between several dry coolers for redundancy?
Yes, this is a common solution. If one unit fails, part of the capacity remains, and the units can be serviced one at a time if each has its own isolation valves. We compare this with other redundancy schemes: a chiller with dry coolers, a chiller with free cooling, a chiller with a closed-circuit cooling tower. Decide in advance what percentage of cooling must remain in case of a failure and at what outdoor heat. The pumps also need redundancy: a standard NCT pump skid follows a 1+1 arrangement with automatic changeover.
More on the page Buy an NCT dry cooler from the manufacturer
↑ Back to the list of questions
Other equipment: condensers, pump skids, containers, control panels
↑ Back to the list of questions
Can glycol be kept in a galvanized tank?
No. Zinc reacts with the inhibitors, sediment forms, and the solution's protection is depleted. Glycol vessels are made of polyethylene or stainless steel. A galvanized tank is suitable for water. Without monitoring, glycol oxidizes within 3–5 years and starts to corrode metal, so the concentration is checked at startup, every autumn and after every top-up.
More on the page Auxiliary equipment
↑ Back to the list of questions
Can we top up a glycol circuit with plain water if it leaks a little?
Better not. A 60 m³ circuit with 40 % propylene glycol drops to 34 % after three top-ups of 3 m³ of water each, and the freezing point rises from −21 to roughly −16 °C. In frosty weather this may cost you a heat exchanger, so top-ups are done only with solution of the same concentration.
More on the page Auxiliary equipment
↑ Back to the list of questions
Will an NCT heat exchanger fit a closed-circuit cooling tower from another manufacturer?
We make replacement coils for Evapco, Decsa and Baltimore closed-circuit cooling towers and evaporative condensers. Send the unit model and coil dimensions so we can check the fit. For a dry cooler or another make, the engineer needs the unit’s technical data sheet to assess compatibility.
More on the page Auxiliary equipment
↑ Back to the list of questions
We are offered a magnetic or ultrasonic device instead of chemicals. Will it replace water treatment?
No. The physics of such devices partly works, but they do not solve two problems: a magnetic field does not remove biology, including Legionella, and the salts stay in the circuit, so blowdown is still needed. If the device supplier is confident in the result, ask them to take written responsibility for Legionella in the circuit.
More on the page Auxiliary equipment
↑ Back to the list of questions
If a cooling tower is already installed, can we add only controls or water treatment?
Water treatment can be installed on a running circuit; we start with a water analysis. We take on controls for third-party equipment without replacing it with ours only in exceptional cases.
More on the page Auxiliary equipment
↑ Back to the list of questions
Won't it be too cramped for maintenance?
There will be no spacious machine room, but an ordinary fitter can reach the pumps and service them. We build the aisles into the layout at the design stage, and replacing a unit does not require a crane on site.
More on the page Containerized units and container versions
↑ Back to the list of questions
Won't the equipment inside overheat in summer?
Two split systems run inside, a main one and a standby one. If one of them fails, the container is not left without cooling.
More on the page Containerized units and container versions
↑ Back to the list of questions
How is the container unloaded on site?
The container has lifting lugs for unloading, and we provide the spreader beam. If needed, our specialists come out for the unloading.
More on the page Containerized units and container versions
↑ Back to the list of questions
How do you include a containerized unit in a design if the customer has not yet chosen a supplier?
Enter it in the specification as a single item with the capacity and the water temperature schedule: for example, "cooling station 1,200 kW, water 7–12 °C". There is no need to break the contents down by machine. We will work out the pad, pipe entries and power supply together with you before the section is issued.
More on the page Containerized units and container versions
↑ Back to the list of questions
Is a thermostat enough instead of controls?
For a simple task, sometimes yes, but a thermostat gives ±2 °C and switches the motor on in jerks. Frequent starts wear motors out faster, and there are no energy savings. What is worth counting is not the price of the panel but the cost of a day of downtime at your plant.
More on the page NCT control panels and controls
↑ Back to the list of questions
What happens if your programmer quits?
The software is not tied to one person: it is kept by the department together with the documentation in the archive, and any staff engineer can pick up the project. We hand the documentation over to you as well.
More on the page NCT control panels and controls
↑ Back to the list of questions
Can we save money and skip SCADA monitoring for now?
You can, but in a couple of years building it into a finished panel will cost more. A cheap compromise is to reserve an RS-485 port and space in the cabinet from the start.
More on the page NCT control panels and controls
↑ Back to the list of questions
Our designer will write the technical specification. Will you build to it?
Yes, or we will suggest what to simplify. To save time for both sides, we will give them a standard document package: the panel diagram, the controller specification and a questionnaire. If WinCC, KRUG or Wonderware sits at the top level, we agree the protocol before the commercial proposal.
More on the page NCT control panels and controls
↑ Back to the list of questions
What equipment does Cold Energy manufacture?
Under the NCT brand we make cooling towers, chillers, dry coolers, evaporative condensers, pump skids, water treatment and control systems. The plant is in Sertolovo (Leningrad Region); production started in 2015.
More on the page The equipment we build cooling systems with
↑ Back to the list of questions
Whose equipment do you supply besides NCT?
Since 2011 we have been the official and exclusive representative of Thermax in Russia and the CIS. We supply Thermax absorption chillers and absorption heat pumps and have installed more than 60 absorption chillers.
More on the page The equipment we build cooling systems with
↑ Back to the list of questions
What is the warranty?
The standard warranty on NCT chillers, cooling towers and dry coolers is 12 months; it is extended to up to 5 years if we do the installation or installation supervision and commissioning and you sign a service contract with us for the same period. The cooling tower capacity stated in the specification is fixed in the contract. Warranty and service work is done by our own team.
More on the page The equipment we build cooling systems with
↑ Back to the list of questions
Why does an air-cooled condenser fall short in summer while an evaporative one copes?
An air-cooled unit cools the refrigerant with dry air: in hot weather the condensing temperature rises and the compressor works harder. An evaporative unit cools down to the wet-bulb temperature, which is noticeably lower in hot weather. The price for this is water consumption and quality monitoring: without water treatment the tubes scale up.
More on the page NCT evaporative condensers
↑ Back to the list of questions
Our old imported condenser has reached the end of its service life. Can you replace it with yours on the same site?
Yes, this is a common task since foreign suppliers left. For selection, send us:
- the refrigerant;
- the capacity;
- the condensing temperature;
- the dimensions and connection diagram of the old unit. If only the heat exchange section is being replaced, see heat exchangers for cooling towers and condensers.
More on the page NCT evaporative condensers
↑ Back to the list of questions
What should a supplier show you before you can trust their condenser?
A calculation from the selection program for your operating conditions that accounts for refrigerant superheat, not a value from a table. Table capacity does not account for superheat, and at the summer peak the condenser may fall short of it. An emergency shutdown of an ammonia plant costs more than the savings on the purchase.
More on the page NCT evaporative condensers
↑ Back to the list of questions
Our winters go down to −30 °C. Will we have to shut the condenser down and drain it?
No. In frost the spray is turned off and the condenser runs dry, on air alone. Two 1,630 kW VRX2 ammonia condensers for a potato processing plant being built in the Voronezh Region stop the spray below −5 °C. Order the bottom basin outlet: on shutdown the water then drains to an indoor tank on its own. Dry-mode capacity is calculated at the plant for your conditions.
More on the page NCT evaporative condensers
↑ Back to the list of questions
Can pumps of different capacities be run in parallel?
No. On a common header the stronger pump will overpower the weaker one: the check valve of the weaker pump will close, and it will spin with no flow and overheat. Pumps in parallel are selected of the same size, with a check valve on each.
More on the page NCT pump skids
↑ Back to the list of questions
Can the cooling tower pumps be placed on the roof next to it to keep the pipes shorter?
Better not. At the design point the NPSH margin may be sufficient, but with warm water, a low level or a clogged strainer it no longer is. A pump above the water level also does not prime itself after draining. Open-circuit pumps are installed with flooded suction, below the minimum water level.
More on the page NCT pump skids
↑ Back to the list of questions
Why does a variable frequency drive on a pump save almost nothing?
Most often the location of the differential pressure sensor is to blame. If it is on the station headers, the pump holds full head at any load. The sensor is installed on the most heavily loaded branch. In an open circuit the savings are also limited by lifting the water to the cooling tower: this is needed at any flow.
More on the page NCT pump skids
↑ Back to the list of questions
What data do you need to calculate a skid?
- maximum flow and useful head for the most heavily loaded loop;
- fluid and glycol concentration, temperature;
- open or closed circuit;
- redundancy scheme and panel type;
- installation location.
Head estimated "by eye" is the main cause of failures at startup: the pump does not deliver the flow, and the machine trips on the flow switch.
Our design guide "NCT Pump Stations, Tanks, Water Treatment and Glycol" (85 pages, one of seven in the series for engineers) can be sent by email or via Telegram: order it on the resource page.
More questions from designers and operators are covered on the page "Pump stations: questions and answers" (in Russian) by Maxim Krasnov.
More on the page NCT pump skids
↑ Back to the list of questions
Industry solutions
↑ Back to the list of questions
When should an absorption chiller be considered instead of an electric chiller?
When the site lacks electrical capacity, has waste heat (steam, hot water, exhaust gases) or has access to natural gas. Then cooling is produced from heat and almost no electricity is used.
More on the page Cooling solutions by industry
↑ Back to the list of questions
Do you work outside Russia?
Yes. Our projects include sites in Kazakhstan, Belarus, Uzbekistan and Armenia.
More on the page Cooling solutions by industry
↑ Back to the list of questions
What does the free consultation include?
A conversation with an engineer, equipment layout options and a feasibility study. As a result you get a concept, a basis for the technical specification and a plan for the next steps.
More on the page Cooling solutions by industry
↑ Back to the list of questions
We are designing a foundry shop for a car plant. Can you offer equipment based on a description?
From a description we can only give an initial estimate. For a proposal we need the heat from each consumer, the allowable water temperature, the loop cleanliness and the shift schedule. Molds, furnaces and compressors are often split into separate loops: there is no point running a chiller for something that can take water at outdoor temperature. Tell us where the furnace heat goes now: some of the cooling may come from it. We prepare a technical proposal free of charge based on a questionnaire.
More on the page Car Plant Cooling: Casting, Welding, Painting, Cooling Water
↑ Back to the list of questions
If the bath temperature rises by 2 degrees, the line goes out of tolerance. Can a dry cooler hold 14–16 °C?
Not in summer: a dry unit cannot cool below the outdoor temperature, and in hot weather it lags several more degrees behind the outdoor air. A 14–16 °C band is held by a compressor machine with a water reserve in the loop. The dry unit is useful for savings: in frosty weather it will offload the compressors. Start with the line's schematic and its peaks: without them, nobody will seriously promise such a tolerance.
More on the page Car Plant Cooling: Casting, Welding, Painting, Cooling Water
↑ Back to the list of questions
Press oil: a packaged unit or a system with a remote condenser?
If there is space outdoors next to the shop, usually a packaged unit: it is faster to install, often cheaper than a field-assembled system, and is serviced in one place. A remote or water-cooled condenser is needed when the machine will stand indoors: a packaged unit will not work there without powerful ventilation. But first check whether you need a compressor at all. If 30–40 °C is enough for the loop, the chiller can be replaced by a closed-circuit cooling tower or a dry cooler.
We will calculate the system for your site free of charge: submit a request or call +7 (800) 333-49-96.
More on the page Car Plant Cooling: Casting, Welding, Painting, Cooling Water
↑ Back to the list of questions
We are replacing the air conditioning in a 12,000 m² business center. How many machines do we need, and where do we put them if the roof is in use?
You can't tell from the square meters: first the load is calculated by month and by hour. One large machine is usually not chosen: at night and in the shoulder seasons it goes into short cycling, and if it fails, the office is left without cooling. If the roof is occupied, the machines are placed on a technical floor or in the basement, and the outdoor units are moved to the courtyard. Above offices you need spring vibration isolators: rubber lets too much through.
More on the page Commercial Real Estate
↑ Back to the list of questions
Can we put absorption chillers on an underground floor and the cooling towers on the roof?
Yes, this is a workable scheme, but three things are checked. Pressure: the water column up to the roof gives about 1 bar per 10 m, and the water boxes of most series are rated for 8 kgf/cm². Access route: the machine is checked in advance against the openings and the lifting route. The flue of a gas-fired machine: outlet resistance below 5 mm of water column; a stack shared with a boiler is generally not recommended.
More on the page Commercial Real Estate
↑ Back to the list of questions
In a historic district outdoor units are not allowed, the basement heats up to 50 °C, and once-through water means a huge flow. How else can we reject the heat?
The heat still has to go outside; the only question is where. A workable approach: machines with a water-cooled condenser and a closed loop to a remote unit, a closed-circuit cooling tower or a dry cooler, in the courtyard or on a neighboring roof. A recirculating cycle uses almost 40 times less water than a once-through system. A packaged unit in the basement will not work without powerful ventilation. Keep in mind our lower limit: NCT chillers start from 69 kW.
More on the page Commercial Real Estate
↑ Back to the list of questions
Does a cooling tower 60 m from a residential building need silencers?
For nighttime, most likely yes. If the cooling tower produces 68 dBA at 10 m, at 60 m it will be about 52.4 dBA. The daytime limit of 55 dBA is met, but the nighttime limit of 45 dBA is not. There are two options: a variable frequency drive that holds 70% speed at night and takes off 7–8 dB, or silencers. Silencers add resistance, so the fan has to be recalculated.
We will calculate the system for your site free of charge: submit a request or call +7 (800) 333-49-96.
More on the page Commercial Real Estate
↑ Back to the list of questions
We need to cool a server room, and the equipment has to fit through the door without disassembly. Will you take it on?
Yes, we cool server rooms at many sites and check the openings right away: sometimes the selected machine does not fit through them. Send us the door dimensions and the delivery route, the heat load in kW, the required temperature in the room, and what can be installed outside. If the task turns out to be too small for our equipment, we will tell you right away so that you do not lose time.
More on the page Data center cooling: a turnkey cooling system for a data center
↑ Back to the list of questions
We are considering air, rear-door water heat exchangers and direct liquid cooling. What can you do?
We are responsible for the cold side: everything that carries heat from the hall to the outside. Direct-to-chip cooling is fine with water at 25–35 °C; the main cooling can come from a closed-circuit cooling tower or a dry cooler, and the compressor machine remains as a 10–20% standby. Ordinary servers cannot be converted this way: a cold plate with channels on the chip is needed. What goes inside the rack is decided by the IT equipment supplier; we take the parameters of its circuit as input data.
More on the page Data center cooling: a turnkey cooling system for a data center
↑ Back to the list of questions
We are bringing in racks in stages, and the load grows gradually. How do we avoid buying too much and get the heat right?
Calculate the heat from the power consumption of the devices: heat loss through the enclosure is small and variable, and you cannot count on it. Then split the plant into phases. An oversized machine at low load goes into short cycling, and many chillers are allowed no more than two starts per hour. The first phase is sized for the actual start-up, space and tie-ins are left for the next ones, and the buffer is calculated from the smallest step.
More on the page Data center cooling: a turnkey cooling system for a data center
↑ Back to the list of questions
The dry coolers will come as a package with the mining racks, so we do not need yours. What should we check?
The package will do if it keeps your site going in hot weather. Check three things and decide right away who is responsible for overheating:
- The design point. What air and fluid temperatures are assumed: the unit delivers fluid noticeably warmer than the outdoor air.
- The margin. When the approach is narrowed from 10 to 6 K, twice the surface is needed.
- Winter. How the circuit is protected from freezing: glycol is expensive and does not suit everyone.
We will calculate the system for your site free of charge: send a request or call +7 (800) 333-49-96.
More on the page Data center cooling: a turnkey cooling system for a data center
↑ Back to the list of questions
The machine runs only in the warm season. What should be done with it in winter and before the spring start-up?
In winter, preservation according to the manufacturer's instructions: without it, the idle period risks corrosion if there is not enough inhibitor or there is a micro-leak in the shell. In spring, first a solution analysis and a check of the valves, then a trial start under load at least two weeks before the hot weather. If a fault is found at the height of summer, there will be no time left for repairs. So the date of the trial start is put in the service plan in advance.
More on the page Fertilizer Production
↑ Back to the list of questions
We have surplus steam. How far can the air at the turbocompressor intake be cooled?
Usually down to +15…+20 °C if the machine delivers water at +5…+10 °C: these are our figures for cooling the air upstream of gas turbines. The exact value depends on the humidity, the cooler surface and the allowable intake resistance, so we calculate it for your compressor. A gas-air mixture is considered separately: there are other safety requirements there.
More on the page Fertilizer Production
↑ Back to the list of questions
At what steam pressure will the machine be single-stage, and at what pressure two-stage?
Low pressure gives a single-stage machine, about 0.7 kW of cooling per 1 kW of heat. At 4–9 bar a two-stage machine works, 1.30–1.45 kW, almost twice as much from the same ton of steam. Look at the pressure at the machine inlet, not in the boiler house. Waste steam has two more conditions: superheat of up to 10 °C is acceptable, above that a desuperheater is needed; 5% water in the steam means 4% less cooling and a damaged valve seat.
We will calculate the system for your site free of charge: submit a request or call +7 (800) 333-49-96.
More on the page Fertilizer Production
↑ Back to the list of questions
Can an absorption chiller deliver −18 °C for a cold store?
No. The limit of such machines is −5 °C when running on gas or steam; below that you need a compressor. They will not deliver −6 °C glycol from a 97/70 °C gas engine loop either: the hot water driven series deliver down to 3.5 °C as standard. For the cold store, the freezing machines will remain compressor-based. The heat will be useful here too: by taking over the condensing of the freon, the absorption part will reduce electricity costs, if you have spare steam or hot water.
More on the page Cooling for food processing: from calculation to service
↑ Back to the list of questions
Fish processing: water in two 7 m³ tanks has to be cooled from 11 to 4.5 °C, and the condenser is remote. What will work?
It depends on how many hours you have to do it in. Taking 6.5 °C off 14 m³ requires about 106 kWh: in one hour that is 106 kW, in five hours about 21 kW plus heat gains. So the chiller is calculated against the cool-down schedule, and the tanks act as cold storage. Our chillers start at 69 kW. The water for the product is run through an intermediate heat exchanger; it is not let into the evaporator.
We will calculate the system for your site free of charge: submit a request or call +7 (800) 333-49-96.
More on the page Cooling for food processing: from calculation to service
↑ Back to the list of questions
In summer, the heating medium is only about 75 °C. Will the machine work on such water?
It will, but the capacity will be noticeably below the rated value. The LT series works from 70 °C and is economically justified from 80 °C. Calculate the actual summer supply and return temperatures, not the schedule in the contract with the heating network. In one project, after checking them, the customer chose a direct-fired gas machine. The factory makes the selection for your conditions based on the supply and return temperatures and the flow rate.
More on the page Cooling from hot water: how to turn boiler house heat into cooling
↑ Back to the list of questions
Can a hot water-fired absorption chiller produce very cold water, around +3 °C?
It can, but only to special order. Standard LT and 5G go down to 3.5 °C; for +3 °C the factory selects the machine individually: not from stock, possibly with a different tube material, at a higher price and weight. First check that the process really needs +3 °C: at +5…+7 °C you get a wider pick and easier lead times. With glycol on hot water the catalog gives down to −2 °C; −5 °C is the limit for gas-fired and steam machines, below that only a compressor works.
More on the page Cooling from hot water: how to turn boiler house heat into cooling
↑ Back to the list of questions
Are storage tanks needed in the chilled water and hot water circuits?
In most cases, no. With a 7/12 °C schedule, smooth machine modulation, a large system volume and an even load, a tank is not needed. They are usually not installed in the hot water circuit either; just do not confuse them with expansion tanks: those are always needed, and their volume is calculated from the system and the temperature difference. The exception is a load with peaks. At a dairy plant, the machine stores ice water during quiet hours for the next peak.
We will calculate the system for your facility free of charge: submit a request or call +7 (800) 333-49-96.
More on the page Cooling from hot water: how to turn boiler house heat into cooling
↑ Back to the list of questions
How much cooling do you get from 1 MW of heat?
From 0.7 to 1.45 MW, depending on the heat source. Hot water and a single-effect machine give about 0.7–0.8 MW. Steam at 4–9 bar or gas and a double-effect machine give 1.30–1.45 MW. That is why the coefficients are only compared for the same type of heat. There is also a downside: a single-effect machine rejects about 2.45 kW to the cooling tower per 1 kW of cooling, while a chiller with a COP of 5 rejects only 1.2 kW.
More on the page Other Solutions
↑ Back to the list of questions
The design calls for five chillers. Can they be replaced with a pair of absorption chillers on gas or hot water?
Yes, but this is a new calculation, not an edit to the specification. Two machines instead of five mean that if one fails, half of the cooling is lost, so the redundancy has to be reconsidered. The cooling towers and their water circuit will get bigger. Gas or hot water is chosen by price and availability: a gas-fired machine gives almost twice as much cooling per unit of heat, but it needs a flue and a room that meets boiler house codes. Often one chiller is kept alongside.
More on the page Other Solutions
↑ Back to the list of questions
Do the solution and water in an absorption chiller need to be replaced periodically?
No, that is a myth. Lithium bromide and deionized water are charged for the entire service life; only the lithium molybdate-based inhibitor is topped up. The solution has to be replaced only after gross violations of the operating instructions. It is monitored constantly: the service team takes samples twice a year for 10 parameters and, if the solution is contaminated, prescribes filtration with a magnetic filter. Acid is not poured into the machine during maintenance: that is exactly what damages it.
We will calculate a system for your facility free of charge: submit a request or call +7 (800) 333-49-96.
More on the page Other Solutions
↑ Back to the list of questions
There are columns and ether vapors nearby. Does the absorption chiller need to be explosion-proof, and where should it be installed?
The machine itself is usually moved outside the hazardous area, and what remains near the columns is made explosion-proof: the pumps, controls and sensors on the heat transfer fluid. The zone boundaries are set by the plant's design. Keep in mind that the machine needs above-zero temperatures, so moving it out means placing it at a distance in a separate heated module.
More on the page Petrochemicals
↑ Back to the list of questions
Can cooling for the condensers of distillation columns be produced from the heat of process vapors?
Yes, if the heat is surplus and is available the whole time cooling is needed. As a guide, 1 kW of heat gives about 0.75–0.82 kW of cooling on hot water and 1.30–1.45 kW on 4–9 bar steam. The machine comes as a stand-alone unit and is integrated into the existing scheme. The main question here is a different one: where to get cooling during column start-up and shutdown. Usually a chiller is kept nearby as a backup.
More on the page Petrochemicals
↑ Back to the list of questions
Do you make air-cooled heat exchangers, including to drawings and in explosion-proof design?
Yes, we make air-cooled heat exchangers to order. Send a drawing or a questionnaire: the product and its composition, pressure, temperatures, flow rate and zone class. We will also look at which option pays off better. If the product can be cooled through a heat exchanger, for example amine at 12 atm and pH 11–12, we will also calculate a water or glycol circuit with a dry cooler; we manufacture dry coolers ourselves. The heat exchanger steel is chosen according to the product composition.
More on the page Petrochemicals
↑ Back to the list of questions
The evaporator will be made of carbon steel, and we are cooling alkanes and an absorbent. What is not allowed in the medium?
Hydrogen sulfide, oxygen, water, chlorides and any organic acids: with them, the unit will fail from corrosion. That is why the full composition of the medium is needed before selection, not after shipment. Name the impurities too, not only the main product. If they cannot be excluded, a different material is used or the circuits are separated by a heat exchanger.
We will calculate the system for your facility free of charge: submit a request or call +7 (800) 333-49-96.
More on the page Petrochemicals
↑ Back to the list of questions
Which type of absorption chiller is better with a gas engine: one on jacket water or one on exhaust?
It depends on what heat you have available. A single-stage machine is used for jacket water at 90–95 °C. Free exhaust gives almost twice as much cooling from the same heat. The price of that: a calculation of the engine back pressure, a diverter damper, and selection against the curve at 100, 75 and 50% load. The exhaust temperature rises as the load falls. For the calculation we need the gas flow rate and temperature and the jacket water curve.
More on the page Trigeneration
↑ Back to the list of questions
How does a gas engine, absorption chiller and cooling tower set work in severe frost?
If cooling is not needed in winter, the absorption chiller stands idle and all the heat goes to space heating. If it is needed year-round, that is possible, but it will require separate solutions. The machine itself is in a warm room. Outdoors, the dangers are freezing and overcooling of the water, hence the winter kit and the bypass on the cooling tower, and a complete stop of circulation is not acceptable. We do not recommend replacing the water with antifreeze: its heat capacity is worse, and it has different requirements for seals.
More on the page Trigeneration
↑ Back to the list of questions
How do we provide N+1 redundancy for gas engines and absorption chillers?
A standby gas engine does not reach its rated output at once, and the heat supply dips for those minutes. The dip is covered by spare engine capacity or by a gas-fired hot water boiler house. Redundancy is needed on the cooling side too: the absorption chiller itself takes about 30 minutes to reach its operating mode, so for a continuous process a cold storage tank or a chiller is kept next to it. The control panel is powered from a UPS: without power for longer than 3 minutes, the solution may crystallize.
More on the page Trigeneration
↑ Back to the list of questions
We will buy electricity, the price is good. Why do we need gas engines with absorption chillers?
Perhaps you don't; that is checked with numbers. In a model calculation for a dairy plant with 2 MW of cooling, the difference in investment pays back in 2.2 years, and at other gas prices and tariffs the payback period lies between 1.6 and 4.1 years. Below 2,000 operating hours a year and below 300 kW of cooling, an absorption chiller does not pay back. You can estimate the payback for your hours and tariff in the trigeneration calculator (in Russian). Count the downsides too: there are two service contracts, and gas limits are not granted everywhere. If the question is only about cooling, a gas-fired absorption chiller without gas engines may be enough.
We will calculate the system for your site free of charge: submit a request or call +7 (800) 333-49-96.
More on the page Trigeneration
↑ Back to the list of questions
It is hot for only two or three months, when it is above 25 °C outside. Will cooling the air in front of the turbine pay back in this mode?
If you count only the electricity savings, most likely not. The usual guideline for an absorption chiller is that cooling is needed for 3,000–4,000 hours a year or more, and three months is about 2,200 hours. Here you need to count something else: what the power not delivered on peak days costs, and the extra gas. If the plant is up against its supply obligations at that time, the answer may be different. Start with the monthly generation schedule.
More on the page Inlet Air Cooling for Gas Turbines and Gas Engines
↑ Back to the list of questions
How do you lower the intake temperature of a gas engine?
Feed chilled water from an absorption chiller or a chiller to a heat exchanger at the intake. But first find out what limits the engine: the intake air or its cooling circuit. If the dry coolers cannot cope in summer, the intake will not help: a dry unit delivers fluid noticeably warmer than the outdoor air, and then you need a second dry cooler, adiabatic cooling or a combination with a cooling tower.
More on the page Inlet Air Cooling for Gas Turbines and Gas Engines
↑ Back to the list of questions
What waste and emissions does an exhaust-gas absorption chiller with a thermal capacity of 5,000 kW produce?
Such a machine has no emissions of its own: it burns no fuel and only takes heat from the gases. The lithium bromide solution is charged for the entire service life and is not drained. There is one constant discharge: the cooling tower blowdown, which goes to the sewer under the network owner's conditions. A backup burner, if there is one, is calculated separately. The calculation itself is done by the designer in the environmental section; we provide the input data.
More on the page Inlet Air Cooling for Gas Turbines and Gas Engines
↑ Back to the list of questions
The turbine is shut down, but cooling is still needed. Can you install an exhaust-gas machine with a backup burner?
Yes, the factory selects such a machine with a backup burner option for the site's data. But for the air in front of the turbine it is unnecessary: if the turbine is not running, there is no need for cooling either. A burner is justified if the cooling also goes to the workshops. Check the gas path: on shutdown or power loss, the diverter damper must switch to bypass, and the pressure drop must not exceed the allowable back pressure.
We will calculate the system for your site free of charge: send a request or call +7 (800) 333-49-96.
More on the page Inlet Air Cooling for Gas Turbines and Gas Engines
↑ Back to the list of questions
Can the hot water that a combined heat and power plant sends to its cooling towers be used for other needs?
Yes, if there is someone nearby to take this heat. It will not give cooling: before the cooling tower, the water is much colder, and a machine needs at least 80 °C to produce cooling. Such water is upgraded by an absorption heat pump: it takes in 25–50 °C, delivers 60–105 °C and additionally needs steam, gas or hot water. The economics are based on the smallest of the three: the operating hours of the plant, of the consumer and of the driving heat source.
More on the page Waste Heat Recovery
↑ Back to the list of questions
An absorption heat pump: there are few cases in Russia, and in our calculation it does not pay off. How can this be checked and management convinced?
First recalculate the hours; that is where the error most often lies. If the consumer is space heating for 4,600 hours, a calculation based on the source's 8,400 hours will overstate the savings almost twofold. For a gas-fired machine, take a coefficient of 1.46 from the meter, not 1.72. If it still does not add up after that, there is nothing to pay off: without a free heat source, a boiler is simpler. We have experience, for example, a pulp and board mill in Svetlogorsk.
More on the page Waste Heat Recovery
↑ Back to the list of questions
Does an absorption heat pump need a separate building?
As a rule, yes, and it is included in the budget from the start. The machine is insulated and installed in a hall at +5…+45 °C; otherwise, the selection is not valid and there is no capacity guarantee. A turnkey scope includes surveys and the building, piping, power supply and controls with an interface to the plant's process control system. For an estimate, a site plan with the connection points for the low-grade heat, the heated water, steam and condensate is needed. Before the design stage, the cost is preliminary.
More on the page Waste Heat Recovery
↑ Back to the list of questions
Where should the heat of an absorption heat pump go in summer, when space heating is off?
To a backup heat sink: a cooling tower or a dry cooler for the remaining capacity. Without it, the machine hits the upper temperature limit and goes into dilution, and the steam is wasted. This unit is included in the design from the start. At the same time, calculate how many months the consumer actually takes heat: the savings depend on this, not on the rated coefficient.
We will calculate the system for your facility free of charge: submit a request or call +7 (800) 333-49-96.
More on the page Waste Heat Recovery
↑ Back to the list of questions
Engineering
↑ Back to the list of questions
Should we order the design separately or together with supply and installation? And who handles approvals with the fire authorities and inspectors?
Ordering in parts usually costs the most: mistakes surface at the interfaces. If design, supply and installation are all with us, there are no interfaces and you deal with one company. If the design is someone else's, our equipment sections can be checked in advance free of charge. Before starting, sign the technical specification and scope of work, and list approvals with the authorities there as a separate line: who handles them and who pays.
More on the page Engineering center
↑ Back to the list of questions
Who pays for rework if the design turns out to have a mistake?
It depends on who issued the design and who installs to it. If an installer works to someone else's design with obvious mistakes, the installer writes into the contract that it is not responsible for how such a system works, and the dispute over rework stays between the customer and the designer. When design, supply and installation are with one company, there is no one to split the mistake with: the same contractor is responsible. Before ordering equipment, it is better to have someone else's design checked in its equipment sections.
More on the page Engineering center
↑ Back to the list of questions
What is not included in your design and stays with us?
Usually everything that is not part of the cooling system, but the boundary is different every time. For example, on a data center cooling project the scope included the cooling system, its automation and electrical work, external utilities and structures. Not included were the building survey and redesign, drainage, general electrical and fiber optic cabling, access control and fire alarm, pipe racks, fencing and lightning protection. Read the list of exclusions before signing: that is exactly where extra charges come from later.
More on the page Engineering center
↑ Back to the list of questions
The cooling tower in the design cannot cope in summer. Where do mistakes usually happen while still on paper?
Most often in the wet-bulb temperature. People take the figure for the city and forget the correction for the location: under SP 60.13330 (Russian building code) it is +1.5 °C in the shade, +3 °C in the sun and another +3 °C on a flat roof with walls closer than 3 m. Recirculation adds 1–3 K. The second mistake: an open or closed-circuit cooling tower chosen without taking the water and the temperature into account. Agree on the design value with the customer before selection; it is a common point of disagreement.
We start with a free consultation, layout options and a feasibility study: submit a request or call +7 (800) 333-49-96.
More on the page Engineering center
↑ Back to the list of questions
Partners
↑ Back to the list of questions
We want to work with you as partners. What are the terms?
Contact our head office: +7 (812) 332-53-66 or info@colden.ru. The terms depend on the format, so we do not publish them on the website. State right away who you are: an installation contractor, a trading company, a general contractor or a designer, which regions you work in and which project or line of business you are bringing. Then the conversation starts with the substance, not with a generic letter about cooperation.
More on the page Partnership
↑ Back to the list of questions
We are an installation contractor. Do we need accreditation from the manufacturer so that the customer does not lose the warranty?
The warranty depends above all on the order of work. If the customer gives the installation to you, you install, our engineers supervise the work and carry out commissioning, and the warranty runs from commissioning. Do not start the equipment before the engineer arrives. Fix the installation supervisor's comments on piping, cables and sensors before start-up. For questions about formal requirements, contact our head office: +7 (812) 332-53-66.
More on the page Partnership
↑ Back to the list of questions
We are from a neighboring country. Will you supply for our projects or for resale in a tender?
Yes, we consider this. As of March 2026, the NCT reference list included 36 projects in six countries outside Russia, most of them in Kazakhstan and Belarus, as well as in Uzbekistan, Armenia and others. In the application, state the country, the project and the format: direct supply, resale or participation in a tender. Contact our head office about the terms: the documents and delivery depend on the country and the equipment.
To discuss a partnership: submit a request or call +7 (812) 332-53-66 (toll-free within Russia: +7 (800) 333-49-96).
More on the page Partnership
↑ Back to the list of questions
What discount do you give a trading company?
Contact our head office: +7 (812) 332-53-66 or info@colden.ru. We do not state specific discounts on the website; they depend on the project. In your inquiry, say right away that you are coming as a trading company, and state the project, the stage and the end customer. Without this, the proposal may come to you as to an ordinary buyer.
More on the page For Dealers
↑ Back to the list of questions
I will bring a project. Will you register the end customer to me or give it to another partner?
Contact our head office with this question: +7 (812) 332-53-66 or info@colden.ru. We do not promise anything in advance on the website; we decide for each project. To make the conversation concrete, describe the project and the customer, the project stage and what has already been done: whether the parameters have been collected and whether the questionnaire has been filled in. Come with the data as early as possible.
More on the page For Dealers
↑ Back to the list of questions
The diagram in the technical and commercial proposal shows butterfly valves, ball valves and an expansion joint. Are they included in the price?
Not necessarily. The diagram shows how the machine is connected, while the price is determined by the scope of supply. For example, the spray pump may be included in the price, while the butterfly valves, ball valves, balancing valve, expansion joint and three-way valve are not, even though they appear on the diagram. Before you give the price to your customer, check the scope of supply item by item and ask us to add what is missing.
To discuss a partnership: submit a request or call +7 (812) 332-53-66 (toll-free within Russia: +7 (800) 333-49-96).
More on the page For Dealers
↑ Back to the list of questions
Other questions
↑ Back to the list of questions
What does Cold Energy (NCT) do?
It is a full-cycle engineering company from St. Petersburg: it designs industrial cooling systems, manufactures equipment under the NCT brand (cooling towers, chillers, dry coolers, evaporative condensers), supplies Thermax absorption chillers, and carries out installation, commissioning and service.
More on the page Cold Energy (NCT) — industrial cooling, turnkey
↑ Back to the list of questions
Where is NCT equipment made?
At our own plant in Sertolovo (Leningrad Region): process engineering, fabrication, assembly, painting, factory testing and multi-stage quality control.
More on the page Cold Energy (NCT) — industrial cooling, turnkey
↑ Back to the list of questions
Can I order a turnkey cooling plant?
Yes. One company is responsible for every stage: concept and design, manufacturing and supply of equipment, installation, commissioning and service.
More on the page Cold Energy (NCT) — industrial cooling, turnkey
↑ Back to the list of questions
How do I get a quote?
Contact our head office in St. Petersburg: +7 (812) 332-53-66 or info@colden.ru. An engineer will clarify the input data, select the equipment and calculate the cost free of charge. See contacts.
More on the page Cold Energy (NCT) — industrial cooling, turnkey
Let us size a cooling system for your site
An engineer will select the equipment and send you a calculation. Free of charge, no obligation.