Cooling equipment service
In brief. Cold Energy (NCT) takes responsibility for the whole cooling system — from survey and design to NCT manufacturing, installation by our own crews, commissioning and 24/7 service; our own service department maintains NCT cooling towers and chillers and Thermax absorption machines during and after the warranty period, across Russia and the CIS.

We take on the full scope of service and maintenance of cooling equipment — NCT cooling towers, chillers and dry coolers and Thermax absorption machines: scheduled maintenance, diagnostics, repair, upgrades, commissioning and 24/7 emergency call-outs. One company is responsible for the result: we design cooling systems, manufacture NCT equipment at our own plant in Sertolovo (Leningrad Region), install it with our own crews and service it ourselves. Our service engineers are the same people who installed and started up this equipment.
Cooling equipment runs for years only if it is serviced on time: a cooling tower is cleaned and prepared for winter, a chiller has its circuit and controls checked, and an absorption machine needs its solution and vacuum monitored. We service equipment under warranty and after it, under a contract or on one-off call-outs.
What is included in the work, and who is responsible for what?
Service is the last stage of the full cycle. We handle every stage ourselves, so at each one the customer deals with a single responsible party:
| Stage | What we do | Result for the customer |
|---|---|---|
| Survey | An engineer inspects the cooling system on site free of charge | It is clear what needs repair, what needs an upgrade and what will keep running for a long time yet |
| Concept and feasibility study | The engineering center works out options for the system layout | A justified choice of equipment and layout before design starts |
| Design | Design documentation (Stage P) and working documentation (Stage R); the engineering center holds an SRO (self-regulatory organization) certificate and is certified to GOST ISO 9001 | Documentation to build and install from |
| Manufacturing and supply | NCT cooling towers, chillers and dry coolers from the plant in Sertolovo, Thermax machines as the official representative; chillers and cooling towers may be in stock, otherwise 10–12 weeks; factory testing at the customer's request | Equipment on time and from one supplier |
| Installation | Installation and installation supervision by our own crews | No gaps between the supplier and the installer |
| Commissioning and handover | We bring the system to operating mode and hand it over after integrated testing — usually 72 hours under process load; we train the operations team | The system is accepted under real load, and the staff know how to run it |
| 24/7 service | Scheduled maintenance, diagnostics and online monitoring, repair, emergency call-outs | The equipment lasts its full service life, and repairs are planned rather than emergency |
What does the service include?
| Service | What we do |
|---|---|
| Scheduled maintenance | Regular work to the manufacturer's schedule: inspection, cleaning, checks of components and controls |
| Diagnostics and monitoring | We check the condition of the system on site and remotely, online |
| Repair and upgrades | We fix faults in NCT and Thermax equipment, replace components and improve the efficiency of older systems |
| Installation supervision and commissioning | We start up the equipment, bring it to operating mode and put it into service |
| Staff training | We show the customer's operations team how to work with the equipment |
| 24/7 emergency call-out | We take requests around the clock and come out when equipment stops |
| Cleaning and disinfection | We clean and disinfect the inside of the cooling tower: fill, water distribution, drift eliminators; we check and tune the NCT water treatment |
| Vibration checks | Vibration readings and condition monitoring, so that repairs are planned rather than emergency |
We keep spare parts for NCT equipment in stock, so repairs do not wait for parts to arrive from abroad.
Why one company instead of three contractors?
When design, supply and installation are handled by different firms, at start-up each one answers only for its own part, and the cause of a failure is sought at the interfaces. We have no such interfaces: whoever designed and installed the system also starts it up and services it.
- Our own NCT plant. Manufacturing in Sertolovo has been running since 2015: we assemble the equipment ourselves and keep common spare parts in stock in St Petersburg. For purchased components such as compressors, we confirm the lead time after checking the supplier's stock.
- Thermax machines from the official representative. Since 2011 we have been the official and exclusive representative of Thermax in Russia and the CIS, and we have installed more than 60 absorption chillers.
- Handover after integrated testing. The system is accepted once it has run under process load, usually for 72 hours, not after a trial start with no load.
- One service contract. The cooling towers, chillers, pumps and controls of a plant are maintained by one service team, and the customer receives one report.
Since 2011 the company has completed more than 780 projects for more than 1,000 customer enterprises.
What is the warranty, and what determines its term?
The standard warranty is 12 months. It is extended to up to 5 years if we do the installation or installation supervision and commissioning and you sign a service contract with us for the same period. The warranty against perforation corrosion is 10 years. The term and conditions are written in the supply contract: discuss them before signing, not after start-up.
How do you request service?
- Call +7 (812) 332-53-66 (multi-line) or +7 (800) 333-49-96 (toll-free within Russia), or submit a request.
- An engineer will clarify the equipment, the symptoms and the timing.
- Diagnostics — on site or remotely.
- We agree on the work and the cost, then carry out the repair or maintenance.
- We hand over a report and recommendations for further operation.
Can we invite an engineer free of charge first?
Yes. Not sure about the condition of your cooling system? Invite our engineer. He will survey the cooling equipment free of charge and tell you what needs repair, what needs an upgrade and what will keep running for a long time yet. Requests — by phone at +7 (800) 333-49-96 or via the form.
What equipment do we service?
- NCT cooling towers — open and closed-circuit: cleaning, replacement of fill and drift eliminators, winter preparation — details on the Cooling tower maintenance and repair page.
- NCT chillers — checks of the refrigerant circuit, compressors and controls — details on the Chiller repair and maintenance (in Russian) page.
- Thermax lithium bromide absorption chillers — we are the official and exclusive representative of Thermax in Russia and the CIS, and our service engineers have trained with the manufacturer. About absorption chillers — on the absorption chillers page.
- Pump skids, water treatment and controls that are part of the systems we have supplied.
An engineer will survey a system with any equipment; we provide service and repair only for NCT and Thermax equipment, including in systems we supplied and installed ourselves. NCT cooling tower, chiller and dry cooler models are on the manufacturer's website nc-t.ru (in Russian).
How does it work on real sites?
A few examples among many others:
- Triumph Plaza shopping and entertainment center, Obninsk. Since 2016 we have been servicing the chiller plant based on Thermax absorption chillers and cooling towers, which we designed and installed ourselves. Over this time the customer has had no problems with the equipment — as stated in a letter of thanks (in Russian).
- Mosgaz OJSC engineering center, Moscow. We service two gas-fired Thermax absorption chillers and cooling towers. The customer noted that the service work was done professionally, in full and on time (review (in Russian)).
- Moloko JSC. We replaced an outdated field-erected cooling tower and upgraded the cooling system for year-round operation and ease of maintenance (about the project (in Russian)).
This is what a cooling tower maintenance visit looks like:
NCT to the rescue — cooling tower maintenance work (in Russian)

Which stages can be ordered separately?
Each stage can be ordered separately or together — turnkey, with one party responsible for the result:
- cooling system design — concept, feasibility study, design and working documentation;
- manufacturing of NCT equipment at our plant in Sertolovo;
- equipment selection and supply — NCT and Thermax, across Russia and the CIS;
- installation, installation supervision and commissioning — by our own specialists: chiller installation and cooling tower installation;
- turnkey cooling systems and chiller plants — from design to start-up.
A detailed schedule is in the article Chiller maintenance: service schedule (in Russian).
For the run-up to the hot season, use our "Summer Cooling Readiness Checklist" (17 pages: checks for chillers, cooling towers and absorption chillers 6, 4 and 2 weeks ahead of the heat, based on 337 entries in our deviation log). It goes out by email or via Telegram: get it on the resource page.
Frequently asked questions
Engineers travel from another city, and service ends up expensive. How can this be reduced?
Cut out unnecessary trips. With your consent, the equipment is connected to the control room over a secure channel, and some issues are resolved remotely. An extended spare parts kit for your warehouse can be included in the delivery; then the engineer does not wait for parts and travels once. We can also train your specialists or a local service company; training is paid. Scheduled work is conveniently combined into one visit.
What is not covered by the warranty? We thought everything had to be repaired free of charge.
The exact list is in your contract, but the warranty usually does not cover violations of the installation and operating instructions, or a fault that cannot be reproduced or is cleared by adjustment, cleaning or maintenance. Foreign objects, weather, birds and power supply outside GOST are not covered. Without a photo of the nameplate and the documents, the case will not be considered. If a case turns out not to be covered by the warranty, we offer paid diagnostics or repair. Disputed cases are reviewed based on photos, the log and measurements.
Who pays for the call-out if the case turns out not to be covered by the warranty?
The customer: a non-warranty case is paid in full, including the call-out. To avoid a wasted trip, first send a description, photos and video of the defect, a photo of the nameplate and the maintenance log: some cases can be resolved from these or remotely. If the fault is cleared by adjustment or cleaning, this is usually not a warranty case either. The scope and cost of work are agreed before we start.
We want to maintain the equipment ourselves. What happens to the warranty?
You can do scheduled work yourselves after training, if the contract allows it and you keep a maintenance log. Repairs are different: if the customer repairs the equipment themselves, the warranty on that equipment is void. So if there is a fault, notify us in writing first. Check your tools as well: you need, for example, ultrasonic flow meters. If you lack the expertise, the service team will take on the tuning of controllers and of pressure and temperature control, and will teach your people to work with the controls.
What documents are needed for a warranty claim to be considered at all?
A letter with a description, a defect report, photos and video of the defect, a photo of the nameplate with the serial number, the installation and commissioning certificate, and the maintenance log. Photos of the motor and measurements of currents and resistance are often requested as well. The review period starts from the complete package, so one missing document delays the answer. Keep the log from day one: without it, disputing the cause of a failure is hardest. Send the letter as soon as you find the defect; after that, running the faulty machine is at your own risk.
Another company commissioned the system: the absorption chiller gives half its capacity, and the cooling tower runs at 40%. Can you restore it?
If the equipment is NCT or Thermax, yes. First our specialist inspects the site. The restoration work is arranged under a separate service contract, and the scope often includes the water treatment panels and pumps. The visit date is agreed in advance, because the plant is shut down for the duration of the work.
Need service or a system survey? Submit a request or call +7 (800) 333-49-96.
Let us size a cooling system for your site
An engineer will select the equipment and send you a calculation. Free of charge, no obligation.