The equipment we build cooling systems with

In brief. Cold Energy (NCT) supplies equipment of its own NCT brand (cooling towers, chillers, dry coolers, evaporative condensers, pump skids, water treatment, controls) and Thermax absorption machines. NCT has been made in Sertolovo (Leningrad Region) since 2015; Thermax has been represented in Russia and the CIS since 2011.

We supply industrial cooling equipment of two brands: our own NCT and Thermax. Since 2016 our plant in Sertolovo (Leningrad Region) has been making NCT cooling towers, chillers, dry coolers, evaporative condensers, pump skids and other equipment. Since 2011 Cold Energy has been the official and exclusive representative of Thermax absorption chillers and heat pumps in Russia and the CIS. The range is designed for industrial plants, energy centers and commercial real estate.

What we make under the NCT brand

All processes are concentrated at one plant in Sertolovo: process engineering, fabrication, assembly and painting, factory testing and multi-stage quality control. The products meet Russian GOST standards and replace imported equivalents.

  • Specifications guaranteed as per the technical specification. Our NCT Select program performs the thermal calculation for the given parameters and offers several options at once.
  • 5,000+ models to choose from. NCT equipment is modular: it is assembled at the plant and delivered to site as ready-made blocks.
  • A replacement for imported equipment — fully Russian production.

Product catalog (in Russian): nc-t.ru.

NCT cooling towers

NCT modular cooling tower
NCT modular cooling tower

Modular fan-assisted cooling towers of open and closed type with centrifugal and axial fans, as well as field-erected sectional cooling towers.

  • Designed not to freeze in winter.
  • Temperature range per tower — up to 45 °C for open and up to 60 °C for closed towers.
  • The capacity stated in the specification is fixed in the contract.
  • More than 5,000 sizes.
  • Modular assembly on site — 1–2 days.
  • Compact dimensions, bolted connections.
  • Comprehensive corrosion protection.

Options: extended packaging, a spare parts kit, a solid bottom panel, a W2C water quality panel, external oil lines for bearing lubrication, motor winding heating, a control panel (on/off or with smooth control), a winter package with basin heating, a plume abatement option, a built-in outlet strainer and a support frame for a concrete base.

Details: NCT cooling towers.

NCT chillers

NCT NASA series chiller
NCT NASA series chiller

NCT chillers come in several series: with scroll, screw and reciprocating compressors, with air-cooled, remote or water-cooled condensers.

  • Warranty of up to 5 years.
  • Low energy consumption, a wide choice of options.
  • Any process fluid.
  • Built to order.
  • Designed for the Russian climate.
  • Bolted rather than welded frame.
  • Freely programmable controllers.

Details: NCT chillers.

NCT dry coolers

NCT DC dry coolers cool water or glycol through a finned heat exchanger, with no evaporation and no make-up water. They are used where there is no make-up water on site, the fluid must stay clean or the circuit runs on antifreeze, and the fluid has to be cooled to 3–5 °C or more above the outdoor air temperature.

  • Capacity from 300 kW.
  • Three designs: horizontal, vertical and V-type.
  • Can cool fluid at temperatures above 60 °C.
  • Installed on the ground or on a roof, on legs or brackets; no load-distribution frame is needed.
  • In winter they run dry, with no make-up and no icing.
  • Options: smooth fan speed control, vibration mounts.

Details: NCT dry coolers.

NCT evaporative condensers

Two types: with axial and with centrifugal fans.

  • Work with any refrigerant.
  • Save water and electricity.
  • Hot-dip galvanized heat exchanger.
  • Affordable maintenance.
  • Winter anti-freeze protection (VRX type).

Details: NCT evaporative condensers.

Auxiliary NCT equipment

Pump skids

Parameter Value
Flow from 16 to 1,560 m³/h
Head from 10 to 100 m of water column
Delivery fully assembled
Testing every pump station is tested

Details: NCT pump skids.

Water treatment

An automatic chemical dosing and blowdown control kit: protects against corrosion, scale and bacteria, extends equipment life, saves electricity and water.

Controls and SCADA

Stable and safe operation of water cooling systems; monitoring and control of the cooling tower, pump station and water treatment; remote control and monitoring.

Details: control panels, containerized units, auxiliary equipment.

Thermax machines

Since 2011 we have been the official and exclusive representative of Thermax in Russia and the CIS and have installed more than 60 absorption chillers. The choice of an absorption chiller is driven by economics: it costs significantly less to operate than a vapor-compression unit. Many sites have waste heat — gas engine exhaust or process steam. For an absorption chiller, this is the energy source: the machine runs almost without fuel costs.

Thermax absorption chillers

Thermax absorption chiller
Thermax absorption chiller

Types: hot water driven, gas and diesel fired, steam driven, exhaust gas driven, triple-effect.

  • Chilled water from −5 to +20 °C.
  • Minimal power consumption: 5 kW of electricity per 1,000 kW of cooling.
  • Can be delivered knocked down — no need to break load-bearing walls.
  • No buffer tank needed: operating range 10–100 % of design capacity.
  • Remote monitoring at any time.
  • High tightness — every machine is helium leak tested.
  • Stainless steel generator tubes, service life over 25 years.
  • Safe corrosion inhibitor — lithium molybdate.
  • Crystallization protection.
  • Simultaneous production of hot and chilled water.

Details: Thermax absorption chillers.

Thermax absorption heat pumps

Lithium bromide absorption heat pumps are an alternative to electric chillers and other water heating equipment. They recover waste heat and raise it to a higher temperature level, running on steam, hot water, exhaust gases, fuel, geothermal energy or a combination of these.

Services for the equipment we supply

  • comprehensive engineering of cooling systems;
  • selection and supply across Russia and to the Customs Union countries;
  • manufacturing of cooling equipment;
  • installation, installation supervision and commissioning;
  • staff training;
  • warranty service and repair.

Examples of completed projects — on the projects page.

If the cooling scheme has not been chosen yet, start with our guide "Choosing a Plant Cooling System" (20 pages: 9 questions to ask before reading quotes, 6 schemes from cooling tower to absorption chiller, a selection algorithm and a 10-year cost of ownership calculation). We will send it by email or via Telegram: order it on the resource page.

More about service, engineering, chiller installation and cooling tower installation.

Frequently asked questions

What equipment does Cold Energy manufacture?

Under the NCT brand we make cooling towers, chillers, dry coolers, evaporative condensers, pump skids, water treatment and control systems. The plant is in Sertolovo (Leningrad Region); production started in 2015.

Whose equipment do you supply besides NCT?

Since 2011 we have been the official and exclusive representative of Thermax in Russia and the CIS. We supply Thermax absorption chillers and absorption heat pumps and have installed more than 60 absorption chillers.

What is the warranty?

The standard warranty on NCT chillers, cooling towers and dry coolers is 12 months; it is extended to up to 5 years if we do the installation or installation supervision and commissioning and you sign a service contract with us for the same period. The cooling tower capacity stated in the specification is fixed in the contract. Warranty and service work is done by our own team.

Let us size a cooling system for your site

An engineer will select the equipment and send you a calculation. Free of charge, no obligation.

Contact us