NCT control panels and controls
In brief. A control panel ties the chiller, cooling tower and pumps into one station. We assemble NCT panels in our own shop, the software is written by our staff engineers, the controllers are open, and SCADA monitoring connects to the plant's system. We supply controls together with our equipment and take responsibility for the whole station.

Without common controls, the chiller, cooling tower and pumps each work on their own, and they have to be integrated on site. We design panels for the station, assemble them at our own plant, program them, commission them and take them on for service. If something happens, you call one phone number.

What panels do we make?
| Panel | What it does |
|---|---|
| Station master panel | combines up to 3 chillers and auxiliary equipment over RS-485 and Modbus RTU: priorities, compressor rotation, emergency modes |
| Chiller panel | installed next to the unit, with its own compressor safety controls |
| Cooling tower panel | power, run and alarm indication, emergency stop, manual and remote mode |
| Dry cooler panel | up to 8 fans per panel, 380 V power circuits, 24 V control circuits |
| Pump skid panel | 2 pumps of up to 37 kW each, automatic standby changeover on failure, SCADA monitoring |
Which controllers do we use and why does it matter?
The controllers are freely programmable, so commissioning and maintenance can also be done by your own specialist, and finding a replacement for them is easier than for a closed system.
| Controller | Where we use it |
|---|---|
| Segnetics SMH4 | standard: color touch panel, station mimic diagrams, Modbus and Ethernet |
| Siemens S7-1500 | large sites and companies with a Siemens standard |
| OWEN TRM210 | simple cooling towers: PID controller with output to a variable frequency drive |
We measure temperature with Pt100 sensors and pressure with 4–20 mA transmitters, and control the fan variable frequency drives with a 0–10 V or 4–20 mA signal.
A variable frequency drive with PID control holds temperature to within ±0.1 °C, while relay control gives ±1–2 °C. Smooth control cuts energy consumption by 20–40 %. For pharmaceuticals, data centers and chemicals this is not a convenience but a condition for a consistent product.

How does the station connect to the plant's system?
| Method | What it transmits |
|---|---|
| Modbus RTU (RS-485) | temperatures, pressures, pump status, alarms, operating hours. The base protocol of all panels |
| Modbus TCP, Ethernet | the same over an industrial network, on Segnetics SMH4 and Siemens S7-1500 |
| OPC UA | large process control systems, on Siemens S7-1500 for a specific project |
| Dry contacts | station alarm, ready status and mode as relay signals |
| Internet monitoring | the operator and the service engineer see the station in a browser; parameters are logged to an archive |
| SMS and Telegram | alarm message to the duty officer |
A system like this with internet monitoring runs, for example, at a greenhouse complex in the Sverdlovsk Region (in Russian) as part of a trigeneration (CCHP) plant. This is one example; many other stations also run on our controls.
How do we assemble panels?
- Our own assembly shop. If the panel needs modifying later, you do not have to look for a third-party assembler with the drawings.
- Our own programmers. Our in-house automation department remembers the logic and will extend the program years later.
- Machine tools instead of an angle grinder. We bend copper busbars on a hydraulic press, make parts on CNC machines and assemble to drawings.
- Industrial components. Spare parts are available in Russia, and replacement takes days, not months.
- Testing before shipment. Every panel is checked at the plant.
- EAEU certificate. NCT distribution, lighting and control panels are certified to TR CU 004/2011 and 020/2011; the certificate is valid until 23.10.2027.
Can I buy a panel separately from the equipment?
We supply controls together with NCT equipment: that way we are responsible for the whole station under one contract. If the site has third-party units, we will first discuss upgrading around them or replacing them with ours; we take on controls for third-party equipment without such a replacement only in exceptional cases. We do not do ventilation controls separately from cooling.
If you only need a standard cabinet for a couple of pumps without a cooling system, we are not the best supplier. For a turnkey station, send a request or call +7 (800) 333-49-96. We will quote a price after receiving the technical specification. Equipment selection is in the "Equipment" section; the controls are also described at nc-t.ru (in Russian).
Our design guide "NCT Cooling Plant Controls and Panels" (82 pages: control levels, sensors and actuators, power supply and the panel, station logic, protocols and SCADA) can be sent by email or via Telegram: order it on the resource page.
Frequently asked questions
Is a thermostat enough instead of controls?
For a simple task, sometimes yes, but a thermostat gives ±2 °C and switches the motor on in jerks. Frequent starts wear motors out faster, and there are no energy savings. What is worth counting is not the price of the panel but the cost of a day of downtime at your plant.
What happens if your programmer quits?
The software is not tied to one person: it is kept by the department together with the documentation in the archive, and any staff engineer can pick up the project. We hand the documentation over to you as well.
Can we save money and skip SCADA monitoring for now?
You can, but in a couple of years building it into a finished panel will cost more. A cheap compromise is to reserve an RS-485 port and space in the cabinet from the start.
Our designer will write the technical specification. Will you build to it?
Yes, or we will suggest what to simplify. To save time for both sides, we will give them a standard document package: the panel diagram, the controller specification and a questionnaire. If WinCC, KRUG or Wonderware sits at the top level, we agree the protocol before the commercial proposal.
Watch: pump stations (in Russian)
NCT recirculating water pump station reviewLet us size a cooling system for your site
An engineer will select the equipment and send you a calculation. Free of charge, no obligation.