Certificates

In brief. This page collects Cold Energy documents: the SRO certificate for design work, management system certificates to GOST R ISO 9001-2015, ISO 14001, ISO 45001 and IATF 16949, EAEU declarations for NCT and Thermax equipment, the Thermax representative certificate and certificates of membership in industry unions.

This page has scans of the documents that confirm Cold Energy (NCT) is approved for design work, its quality management system, the conformity of its equipment to EAEU technical regulations and our representation of Thermax. Each document is briefly described below: what it is, who issued it and what it covers.

What documents does the company have?

Document Issued by Covers
Certificate of approval for work that affects the safety of capital construction projects SRO NP Sodruzhestvo Proektnykh Organizatsiy Preparation of design documentation
Certificate of conformity to GOST R ISO 9001-2015 (ISO 9001:2015) PromTekhStandart voluntary certification system Quality management system of Energiya Kholoda LLC
Certificate of conformity to GOST R ISO 9001-2015 for works Mezhdunarodnaya Sistema Kachestva voluntary certification system Quality management system as applied to the works performed
Certificates to GOST R ISO 14001-2016 (ISO 14001:2015), ISO 45001:2018 and IATF 16949:2016 SDS-SM voluntary certification system, certification body Expert-TekhAnaliz LLC Management system as applied to the supply and sale of refrigeration machines and equipment
EAEU declaration of conformity Applicant: Energiya Kholoda LLC; manufacturer: Thermax Limited Thermax absorption chillers and absorption heat pumps
EAEU declaration of conformity Applicant: Energiya Kholoda LLC; manufacturer: Thermax Limited Thermax absorption heat pumps
Certificate of Representation Thermax Limited Sales and service of Thermax absorption chillers in Russia, Belarus and Kazakhstan
EAEU declaration of conformity Applicant and manufacturer: Energiya Kholoda LLC NCT chillers
EAEU declaration of conformity Applicant and manufacturer: Energiya Kholoda LLC NCT evaporative condensers of the VRX, HRX and SVAX series and air-cooled condensers of the CA series
Certificates of membership CTI, Rossoyuzkholodprom, Union of Power Engineers of the Republic of Kazakhstan, NP ABOK Participation in industry associations

How long are the equipment declarations valid?

Validity as of November 2026. We send copies of the declarations and certificates together with the commercial proposal; their numbers can be checked in the register.

Equipment Document Technical regulations Validity
NCT cooling towers: VR, SVA, SVA-D, VA, HR, VRC, e-VRC, SVAC, e-SVAC, VAC, e-VAC, HRC, C-HRC EAEU declaration TR CU 010/2011, 020/2011 until 04.04.2028
NCT chillers, condensing units and refrigeration machines EAEU declaration TR CU 004/2011, 010/2011, 020/2011 until 13.03.2029
NCT chillers Declaration under scheme 5d based on a type certificate, 2026 TR CU 010/2011 until 13.08.2031
VRX, HRX and SVAX evaporative condensers and CA air-cooled condensers EAEU declaration TR CU 004/2011, 010/2011, 020/2011 until 14.04.2027
VRX A and VRX P evaporative condensers for explosive zones EAEU certificate TR CU 012/2011 issued in 2023
Heat exchange sections of evaporative condensers EAEU certificate TR CU 032/2013 issued in 2022
DCN dry coolers EAEU declaration TR CU 004/2011, 010/2011, 020/2011 until 06.06.2027
NCT PU pump skids EAEU declaration TR CU 004/2011, 010/2011, 020/2011 until 10.08.2028
NCT PU pump skids Declaration under scheme 5d based on a type certificate, 2026 TR CU 010/2011 until 13.08.2031
NCT W0C, W2C, W3C water treatment EAEU declaration TR CU 004/2011, 010/2011, 020/2011 until 31.10.2029
NCT distribution, lighting and control panels EAEU certificate TR CU 004/2011, 020/2011 until 23.10.2027
Thermax absorption chillers and heat pumps EAEU declaration TR CU 004/2011, 010/2011, 020/2011 until 16.05.2029
Thermax absorption heat pumps EAEU declaration TR CU 004/2011, 010/2011, 020/2011 until 21.03.2027

Design approval (SRO)

Since 2014 Cold Energy has been a member of the self-regulatory organization (SRO) NP Sodruzhestvo Proektnykh Organizatsiy. The certificate grants approval to prepare design documentation for capital construction projects. More in the news item "Joining the SRO" (in Russian).

Since 17 May 2023, by decision of this SRO's Council (minutes No. 20/23), we have been entitled to prepare design documentation for especially hazardous, technically complex and unique facilities. For construction work there is a second approval: Cold Energy is a member of the SRO Mezhregionalnoye Obyedineniye Stroitelnykh Kompaniy (MOSK). By decision of its board of 18 November 2024, we have a first-level contractual obligations fund, which gives us the right to perform work under construction contracts awarded through tenders. This covers construction, reconstruction and major repairs, including especially hazardous, technically complex and unique facilities, except nuclear energy facilities.

SRO NP Sodruzhestvo Proektnykh Organizatsiy certificate of approval for design work, sheet 1
SRO NP Sodruzhestvo Proektnykh Organizatsiy certificate of approval for design work, sheet 1
SRO certificate of approval for design work, sheet 2
SRO certificate of approval for design work, sheet 2
SRO certificate of approval for design work, sheet 3
SRO certificate of approval for design work, sheet 3
SRO certificate of approval for design work, sheet 4
SRO certificate of approval for design work, sheet 4

The staff of our design department are also members of the National Association of Surveyors and Designers; see the news item "Cold Energy employees become members of NOPRIZ" (in Russian). The engineering center's documents are collected on the "Design certificates" page (in Russian).

Quality management system to GOST R ISO 9001-2015

The certificate of the PromTekhStandart voluntary certification system confirms that the quality management system of Energiya Kholoda LLC complies with GOST R ISO 9001-2015 (ISO 9001:2015). The set includes the company certificate, the permit to use the conformity mark and the certificate of the expert auditor for internal audits of the quality system.

Certificate of conformity of the quality management system of Energiya Kholoda LLC to GOST R ISO 9001-2015
Certificate of conformity of the quality management system of Energiya Kholoda LLC to GOST R ISO 9001-2015
Permit to use the PromTekhStandart conformity mark
Permit to use the PromTekhStandart conformity mark
Certificate of the expert auditor for internal audits of the quality management system
Certificate of the expert auditor for internal audits of the quality management system
GOST R ISO 9001-2015 certificate, annex
GOST R ISO 9001-2015 certificate, annex
GOST R ISO 9001-2015 certificate, annex
GOST R ISO 9001-2015 certificate, annex

Quality management system for works

A separate certificate of the Mezhdunarodnaya Sistema Kachestva system confirms compliance with GOST R ISO 9001-2015 as applied to the works listed in the annexes to the certificate. The current certificate was issued by the certification body MSK Certification and Standardization Center: valid from 05.05.2026 to 04.05.2029, confirmed by an annual surveillance audit; we send a copy on request. The scans below show the previous certificate No. MSK.OS1.B04015, valid from 08.02.2023 to 07.02.2026 (archive).

Certificate of conformity to GOST R ISO 9001-2015 for works, 2023–2026 (archive)
Certificate of conformity to GOST R ISO 9001-2015 for works, 2023–2026 (archive)
Permit to use the Mezhdunarodnaya Sistema Kachestva mark
Permit to use the Mezhdunarodnaya Sistema Kachestva mark
GOST R ISO 9001-2015 certificate for works, annex
GOST R ISO 9001-2015 certificate for works, annex
GOST R ISO 9001-2015 certificate for works, annex
GOST R ISO 9001-2015 certificate for works, annex
GOST R ISO 9001-2015 certificate for works, annex
GOST R ISO 9001-2015 certificate for works, annex
GOST R ISO 9001-2015 certificate for works, annex
GOST R ISO 9001-2015 certificate for works, annex

Environment, occupational safety and IATF 16949

Two certificates of the SDS-SM system cover the supply and sale of refrigeration machines and equipment. The first confirms an integrated management system to GOST R ISO 14001-2016 (ISO 14001:2015, environmental management) and ISO 45001:2018 (occupational health and safety). The second confirms a management system to IATF 16949:2016.

Environmental, occupational safety and energy management are currently confirmed by an integrated management system certificate of the PromTekhStandart system: GOST ISO 14001-2016, GOST R 54934-2012 (OHSAS 18001:2007) and GOST R ISO 50001-2012. It is valid from 27.09.2024 to 26.09.2027.

Certificate of the integrated management system to GOST R ISO 14001-2016 and ISO 45001:2018
Certificate of the integrated management system to GOST R ISO 14001-2016 and ISO 45001:2018
IATF 16949:2016 management system certificate
IATF 16949:2016 management system certificate

Documents for Thermax products

Cold Energy supplies and services Thermax absorption chillers and heat pumps. The equipment has declarations of conformity to the Customs Union technical regulations TR CU 004/2011, 010/2011 and 020/2011.

EAEU declaration for Thermax absorption chillers and heat pumps
EAEU declaration for Thermax absorption chillers and heat pumps
EAEU declaration for Thermax absorption heat pumps
EAEU declaration for Thermax absorption heat pumps
Thermax Limited representative certificate for sales and service of absorption chillers
Thermax Limited representative certificate for sales and service of absorption chillers
Letter from Thermax Limited on sales support for absorption chillers
Letter from Thermax Limited on sales support for absorption chillers

More about Thermax equipment is on the abxm-thermax.ru website (in Russian).

Documents for NCT products

We manufacture NCT equipment ourselves. EAEU declarations confirm conformity to the technical regulations TR CU 004/2011, 010/2011 and 020/2011.

EAEU declaration for NCT chillers
EAEU declaration for NCT chillers
EAEU declaration for VRX, HRX and SVAX evaporative condensers and CA air-cooled condensers
EAEU declaration for VRX, HRX and SVAX evaporative condensers and CA air-cooled condensers

The NCT equipment catalog is on the nc-t.ru website (in Russian), and our production is described on the "Manufacturing" page.

Membership in industry associations

  • Cooling Technology Institute (CTI, USA): NCT has been a member of the institute since April 2024, as confirmed by a CTI letter dated 5 June 2024.
  • Russian Union of Refrigeration Industry Enterprises (Rossoyuzkholodprom): since 2022.
  • Union of Power Engineers of the Republic of Kazakhstan: the certificate was issued in November 2021.
  • NP ABOK: premium corporate member, 2022 diploma.

Scans of the certificates:

Letter from the Cooling Technology Institute on NCT membership
Letter from the Cooling Technology Institute on NCT membership
Certificate of membership in Rossoyuzkholodprom
Certificate of membership in Rossoyuzkholodprom
Certificate of membership in the Union of Power Engineers of the Republic of Kazakhstan
Certificate of membership in the Union of Power Engineers of the Republic of Kazakhstan
NP ABOK premium corporate member diploma
NP ABOK premium corporate member diploma

Frequently asked questions

What documents come with the equipment? Procurement asks for certificates, a passport and a safety justification.

The equipment comes with a passport, an operating manual and TR CU declarations or certificates for the pumps, motors, compressors and heat exchangers. A safety justification is not part of the standard set. It is developed only if a hazardous production facility needs to deviate from the federal industrial safety rules or those rules are insufficient. The nameplate under TR CU 010 is metal, not a sticker. It is better to agree on the full list before the contract.

The technical specification requires TR CU 012, but the machine stands in a category D room. Is this mandatory?

Usually not, but we decide based on the justification. The declarations for Thermax absorption chillers are issued under TR CU 004, 010 and 020, while 012 covers equipment for explosive atmospheres. Send us the basis for the requirement: the room category and the zone class. If the zone really is explosive, the design is discussed separately. It costs more, and certification is complicated: samples are needed for testing. That is why the requirement should be removed or confirmed at the technical specification stage.

How do you confirm that a control panel meets the requirements?

With three documents: a passport, a test report to GOST IEC 61439 and a registered declaration of conformity to TR CU 004/2011 and 020/2011. On acceptance, check the declaration and report numbers, and look for the EAC mark on the nameplate or in the passport. Ask for copies together with the proposal rather than at delivery: that way you can see in advance whether the set covers the requirements of your technical specification.

Selection and calculation are free: submit a request or call +7 (800) 333-49-96.

Watch: absorption chillers (in Russian)

How Thermax absorption chillers work

Let us size a cooling system for your site

An engineer will select the equipment and send you a calculation. Free of charge, no obligation.

Contact us