Partnership
In brief. Cold Energy works with partners in four areas: dealership, contract manufacturing under the partner's brand (OEM), supply of components and support for designers.

Cold Energy (NCT) designs cooling systems, manufactures and supplies NCT equipment (cooling towers, chillers, evaporative condensers, dry coolers, pump skids) and performs installation, commissioning and service. Around this cycle we build partnerships with companies that sell, manufacture, supply components for and design cooling systems.
What kinds of partnership do we offer?
For dealers
Selling NCT equipment to your customers across Russia and the CIS. We provide a personal manager, training, technical and marketing documentation, access to the NCT Select selection software and equipment delivery. The terms are set in the contract individually for each dealer. More on the "For dealers" page.

For OEM partners
Contract manufacturing of refrigeration equipment under your brand at our production facilities: configuration changes to your technical specification, quality control, components and spare parts, delivery in packaging with your logo, technical support. More on the "For OEM partners" page.

For suppliers
We have a constant need for components for production: metal products made to drawings, shut-off valves, components for control panels, motors, axial fans, cable and more. More about what we buy and how we choose suppliers on the "For suppliers" page (in Russian).

For designers
For design organizations, institutes and design engineers, we provide technical support for projects with NCT equipment, selection software, catalogs, standard designs and piping diagrams, and we hold webinars, seminars and training sessions. More on the "For designers" page (in Russian).
BIM models (Revit) of the equipment are available on request: send a request.

How to start working together
- Send an application through the form on the website and state the type of partnership.
- Add brief information about your company in the "Your task" field. Documents can be sent as files to info@colden.ru.
- We will follow up using the contact details in your request.
Frequently asked questions
We want to work with you as partners. What are the terms?
Contact our head office: +7 (812) 332-53-66 or info@colden.ru. The terms depend on the format, so we do not publish them on the website. State right away who you are: an installation contractor, a trading company, a general contractor or a designer, which regions you work in and which project or line of business you are bringing. Then the conversation starts with the substance, not with a generic letter about cooperation.
We are an installation contractor. Do we need accreditation from the manufacturer so that the customer does not lose the warranty?
The warranty depends above all on the order of work. If the customer gives the installation to you, you install, our engineers supervise the work and carry out commissioning, and the warranty runs from commissioning. Do not start the equipment before the engineer arrives. Fix the installation supervisor's comments on piping, cables and sensors before start-up. For questions about formal requirements, contact our head office: +7 (812) 332-53-66.
We are from a neighboring country. Will you supply for our projects or for resale in a tender?
Yes, we consider this. As of March 2026, the NCT reference list included 36 projects in six countries outside Russia, most of them in Kazakhstan and Belarus, as well as in Uzbekistan, Armenia and others. In the application, state the country, the project and the format: direct supply, resale or participation in a tender. Contact our head office about the terms: the documents and delivery depend on the country and the equipment.
To discuss a partnership: submit a request or call +7 (812) 332-53-66 (toll-free within Russia: +7 (800) 333-49-96).
Let us size a cooling system for your site
An engineer will select the equipment and send you a calculation. Free of charge, no obligation.