Our own NCT plant in Sertolovo: what we make and how we test it

In brief. Cold Energy (NCT) makes cooling towers, chillers and other NCT equipment at its own plant in the Leningrad Region. About 85% of the components are Russian-made; cooling towers and dry coolers undergo aerodynamic and hydraulic testing, chillers at the customer's request; quality is confirmed by ISO 9001 and Gazprom audits.

Cold Energy (NCT) makes NCT refrigeration equipment at its own plant in Sertolovo (Leningrad Region). Design engineering, parts manufacturing, assembly and testing take place at one site, so we make project changes quickly, lead times are shorter and the cost is lower.

What the plant makes and from what

  • NCT cooling towers, dry coolers, chillers, evaporative condensers, pump skids and control panels. The catalog is at nc-t.ru (in Russian).
  • About 85% of the components and materials are Russian-made: we are almost independent of foreign supplies, and repairs and spare parts do not wait for imports.
  • Casings and frames are made of galvanized steel with powder coating, the frame is 4 mm thick, the fasteners are stainless steel, and there are no self-tapping screws. For aggressive environments we make the casing of stainless steel. The stated service life of NCT equipment is 20 years or more.
  • We buy components from Bitzer, Fusheng, Guntner, Wilo, Schneider Electric, ABB, Sevkabel and other suppliers, and we are an official partner of Danfoss.
  • In 2025 an agreement was signed to build a new research and production complex in the Novoorlovskaya special economic zone; more in the news item (in Russian).

How quality is checked

The quality department inspects the product in three stages and looks not only for defects but also for their cause:

  1. Incoming inspection: materials and components.
  2. In-process inspection: at the assembly stages.
  3. Final inspection: the finished product. Before shipment, cooling towers and dry coolers undergo aerodynamic and hydraulic testing, chillers at the customer's request.

The customer can go through any of the three stages together with us with their own inspection committee.

Parts are made on CNC machines, which only trained operators are allowed to run, and painted on automated lines. Production complies with GOST R ISO 9001-2015 (ISO 9001:2015) and is certified by Gazprom.

Cold Energy management system certificate
Cold Energy management system certificate

What product quality rests on

Principle What it means in practice
Staff qualifications The staff are trained to work in NCT production and handle non-standard tasks
Everything at one site Design work, manufacturing and assembly in one place: shorter lead times, lower cost
ISO quality system An extended ISO 9001 quality system covering all the equipment we make
Test program Aerodynamic and hydraulic testing plus inspection at every stage
Assembly of an NCT pump skid in the shop in Sertolovo
Assembly of an NCT pump skid in the shop in Sertolovo

How occupational safety is organized

We manage occupational health and industrial safety according to internal corporate standards. They include:

  • employee training;
  • issuing personal protective equipment;
  • monitoring industrial safety requirements;
  • prevention of occupational diseases;
  • external and internal audits and comprehensive inspections.

What did the special assessment of working conditions show?

The special assessment of working conditions (SOUT) was carried out under Federal Law No. 426-FZ on the basis of an order dated 13 December 2021: of 86 workplaces, conditions are optimal or acceptable at 82 and harmful at 4.

Indicator Value
Workplaces covered by the SOUT 86
Employees at the assessed workplaces 86
Workplaces without harmful factors (subject to declaration) none
Workplaces with optimal and acceptable conditions 82
Workplaces with harmful and hazardous conditions 4

According to the list of recommended measures, no improvement of working conditions at these workplaces is required. The current statements are on the "SOUT" page (in Russian).

How we reduce production risks

  • We operate the machine tools according to the technical documentation and legal requirements, upgrade them on time and fit them with automated operation monitoring systems.
  • We train employees regularly and commission independent expert reviews of production.

What the R&D department does

The research and development department tests equipment and refines the selection and calculation methods so that price, quality and performance match the customer's requirements. It also evaluates new technical solutions and hands them over to production. The head of the department is Nikolai Mikhailovich Trubnikov.

Nikolai Trubnikov, head of the R&D department
Nikolai Trubnikov, head of the R&D department

The department's work is described on the R&D page (in Russian).

What certificates does the company have?

  • a self-regulatory organization (SRO) membership certificate;
  • a certificate of conformity to GOST ISO 9001;
  • an energy management system certificate.

All documents are on the "Certificates" page.

Frequently asked questions

Can we visit the plant before signing a contract?

Yes, no contract is needed for that. We usually show customers and designers the warehouse, the welding area, cooling tower and chiller assembly and the technical inspection department; you can ask the specialists questions right on the shop floor and hold a technical meeting on the project at the same time. Arrange the visit in advance by phone at +7 (800) 333-49-96. If it is a long trip, start with the video about our production (in Russian).

Is Russian assembly of refrigeration machines reliable?

Reliability depends on how the assembly is done, so ask about exactly that. Our frames are bolted together, the assembler works from a detailed 3D model rather than from memory, and every machine goes through the technical inspection department. We buy compressors from proven manufacturers; if you do not trust a particular brand, we will fit a compressor from another manufacturer at your request.

Will you provide a chiller test report: relays, wiring diagram, compressor windings?

Yes, if agreed in advance. We carry out such a test with a report at the customer's request, so before testing we agree on the list: what we check and what we consider normal. This is usually relays, starters and the resistance of the compressor windings. Absorption chillers are leak-tested in a helium chamber before shipment. You can come for the acceptance: the customer's representatives, usually a power engineer, an electrician and a mechanic, come to the plant by written agreement.

Will factory testing confirm the rated capacity of a cooling tower?

No. At the plant, the air flow is measured in dry running, along with the motor currents and the fan speed; the thermal capacity can only be seen under load at the site. In international practice, acceptance tests are carried out to the CTI ATC-105 code within 12 months of operation, after at least 1,000 hours of running, at design conditions: flow rate, inlet temperature and a known wet-bulb temperature. If testing matters, agree right away on who carries it out and how the load is created.

How is a chiller packed, and how do you check that it arrived undamaged?

We design the packaging for the weight, center of gravity, design and mode of transport. Chillers and closed-circuit cooling towers travel with the circuit under pressure:

  1. On acceptance, check the circuit pressure with a pressure gauge.
  2. If there is no pressure, draw up a report with photos and video and notify us.
  3. For delivery in covered transport, sign only for the quantity before unloading, and for the quality after it.

For safe unloading, we will provide a spreader beam on request.

Selection and calculation are free: submit a request or call +7 (800) 333-49-96.

Watch: our production (in Russian)

Tour of the NCT cooling equipment factory

Let us size a cooling system for your site

An engineer will select the equipment and send you a calculation. Free of charge, no obligation.

Contact us