Engineering center
In brief. Since 2011 the Cold Energy (NCT) engineering center has been designing cooling and air conditioning systems, chiller plants and trigeneration energy centers — from the concept and feasibility study to support through state expert review. After that the same company supplies equipment from its own NCT plant and Thermax machines, installs with its own crews, hands the system over after integrated testing and services it 24/7. An engineer's consultation, layout options and a feasibility study are free of charge; complete designs start from RUB 300,000.

Design of cooling and air conditioning systems at Cold Energy (NCT) is the first stage of work for which one company takes full responsibility: from the concept and design to supply, installation, commissioning and service. Since 2011 we have been building turnkey chiller plants and trigeneration (CCHP) energy centers, and the company has completed more than 780 projects. The goal of the design is to cut the customer's construction and operating costs and pay back the investment quickly.
What does the work include and who is responsible for what?
The engineering center handles the paperwork, and everything laid down in the design is then delivered by the same company. The customer signs one contract, or a series of contracts with one contractor, and does not have to coordinate a designer, a supplier and an installer.
| Stage | What we do | Result for the customer |
|---|---|---|
| 1. Consultation and input data collection | We find out the facility's tasks and problems; at an operating plant we verify the input data on site | Technical specification and a plan of next steps, free of charge |
| 2. Engineering concept (in Russian) and feasibility study | We compare layout options and calculate capital and operating costs and the payback period | A justified choice of scheme and budget in 2–4 weeks |
| 3. Design documentation, Stage P (in Russian) | We issue the sections required by Russian Government Decree No. 87 | A package for expert review in 2–3 months |
| 4. Support through state expert review | We respond to the experts' comments on our sections | Comments are closed by whoever issued the sections |
| 5. Working documentation (Stage R) | Drawings to GOST R 21.101-2020, a 3D model, standards compliance review of every issue | Documentation for installation in 2–4 months |
| 6. Manufacturing and supply | NCT chillers, cooling towers and dry coolers from our own plant, Thermax absorption chillers from the official representative | Equipment from stock or in 10–12 weeks, factory testing at the customer's request |
| 7. Installation | We install with our own crews to our own working documentation | No dispute over who made the mistake: the designer or the installer |
| 8. Commissioning and handover | Integrated testing, usually 72 hours under process load | The system is handed over running, not just "installed" |
| 9. Service | 24/7 service, online monitoring | Warranty of 12 months, up to 5 years with our installation and a service contract |
What exactly do we design?
- development of the engineering concept (in Russian);
- feasibility study;
- design of building services, design documentation (Stage P) and working documentation (Stage R) (in Russian);
- expert support through state expert review;
- manufacturing and supply of equipment and materials;
- energy-efficient solutions for high-temperature cooling (above −5 °C).
- designs of cooling systems, chiller plants and recirculating cooling water systems.
We design chiller plants and energy centers based on Thermax lithium bromide absorption chillers and gas engines (gas engine generator sets), as well as chillers, cooling towers and dry coolers of our own NCT production. How trigeneration energy centers built on gas engines and absorption chillers work is described in detail on the dedicated website 3genia.ru.
How long does design take and what do you get?
A pre-design study takes 2–4 weeks, design documentation (Stage P) 2–3 months and working documentation (Stage R) 2–4 months. The content of the design documentation follows Russian Government Decree No. 87 of 16 February 2008, and working documentation is issued to GOST R 21.101-2020. The usual set of sections: cooling, heat engineering, automation, power supply and electrical equipment, steel and concrete structures (KM and KZh), water supply and sewerage. We lay out equipment and piping in a 3D model, and every issue of documentation goes through standards compliance review.

Why one company and not three contractors?
Our principle is to concentrate responsibility within one company. We take a facility from the concept, calculations and selection of materials to construction and equipment service. Responsibility is not spread across contractors, and the customer gets a complete, ready-to-use solution.
- No disputes at startup. When design, supply and installation are in different hands, at the first startup everyone looks for someone else to blame. With us there is one interface, and one company deals with it.
- Our own plant. Chillers, cooling towers and dry coolers (from 300 kW) are made by our NCT production in Sertolovo (Leningrad Region) since 2015. Delivery times and spare parts depend on us, not on an intermediary.
- Thermax direct. Since 2011 we have been the official and exclusive representative of Thermax in Russia and the CIS and have installed more than 60 absorption chillers. The designer specifies a machine with data received directly from the manufacturer.
- Handover after integrated testing. The system is accepted after running under process load, usually for 72 hours, not on the basis of an installation completion certificate.
Who runs the projects?
The engineering center has its own staff of design engineers with extensive experience in absorption cooling and in designing energy-efficient cooling systems. Next to them are the R&D department and our own equipment manufacturing. This allows us to develop, test and offer the customer solutions that suit them both technically and economically.

Technical leadership — Igor Yuryevich Aleksikov, Technical Director of Energiya Kholoda LLC. The team of specialists is on the Experts (in Russian) page.
What can you get free of charge?
Contact our engineers for advice: we will help you work out an overall concept, draw up a technical specification and a plan of next steps. Free of charge you get:
- advice from an experienced engineer;
- equipment layout options;
- a feasibility study.
Which industries do we design for?
We design cooling and air conditioning for industrial and commercial facilities. We have ready-made solutions:
- trigeneration;
- gas turbine and gas engine cooling;
- data centers;
- food processing;
- petrochemicals;
- agribusiness, metallurgy and other industries.
Among our more than 1,000 customer companies are Gazprom, Rosatom, Fyffes, Siemens, Döhler and many others. Selected projects are in the Projects section.
For example, here are two facilities where we did the design ourselves, among many others:
- Kursky Solod malt plant (in Russian): working documentation for the cooling, automation and electrical sections and automation of the recirculating water system; two steam-driven Thermax absorption chillers, four NCT VR cooling towers, panels with variable frequency control and two NCT W2C water treatment panels;
- Zhanazhol gas turbine power plant, Aktobe (Kazakhstan): design and working documentation for the cooling, power supply, HVAC and automation sections; a steam-driven Thermax absorption chiller, two open cooling towers and air coolers; the project raises gas turbine efficiency and power output.

How do we ensure design quality?
- we look for the best price-to-quality ratio — both for the investment in construction and for operation;
- we use only certified materials and equipment;
- our designs comply with ISO 9001, GOST, SNiP (Russian building codes) and other regulations, and our management system is certified to GOST ISO 9001;
- our production has passed audits by Rosatom and Gazprom;
- since May 2023 the SRO (self-regulatory organization) Sodruzhestvo Proektnykh Organizatsiy has approved us to design especially hazardous, technically complex and unique facilities;
- the company holds the necessary licenses and certificates for design and for equipment manufacturing;
- since April 2024 NCT has been a member of the Cooling Technology Institute (CTI, USA), the first in Russia and the CIS.

Documents are on the Design certificates (in Russian) and Certificates pages.
How much does a design cost?
Prices for complete cooling system designs start from RUB 300,000. We keep the cost lower thanks to our own design department and R&D department, a steady volume of work and in-depth knowledge of the equipment we use: we optimize its operating schemes and the number of units.
Our series of seven design guides (614 pages: absorption chillers, cooling towers, chillers, absorption heat pumps, dry coolers, pump stations and tanks, controls) can be sent to you by email or via Telegram: order it on the resource page.
Frequently asked questions
Should we order the design separately or together with supply and installation? And who handles approvals with the fire authorities and inspectors?
Ordering in parts usually costs the most: mistakes surface at the interfaces. If design, supply and installation are all with us, there are no interfaces and you deal with one company. If the design is someone else's, our equipment sections can be checked in advance free of charge. Before starting, sign the technical specification and scope of work, and list approvals with the authorities there as a separate line: who handles them and who pays.
Who pays for rework if the design turns out to have a mistake?
It depends on who issued the design and who installs to it. If an installer works to someone else's design with obvious mistakes, the installer writes into the contract that it is not responsible for how such a system works, and the dispute over rework stays between the customer and the designer. When design, supply and installation are with one company, there is no one to split the mistake with: the same contractor is responsible. Before ordering equipment, it is better to have someone else's design checked in its equipment sections.
What is not included in your design and stays with us?
Usually everything that is not part of the cooling system, but the boundary is different every time. For example, on a data center cooling project the scope included the cooling system, its automation and electrical work, external utilities and structures. Not included were the building survey and redesign, drainage, general electrical and fiber optic cabling, access control and fire alarm, pipe racks, fencing and lightning protection. Read the list of exclusions before signing: that is exactly where extra charges come from later.
The cooling tower in the design cannot cope in summer. Where do mistakes usually happen while still on paper?
Most often in the wet-bulb temperature. People take the figure for the city and forget the correction for the location: under SP 60.13330 (Russian building code) it is +1.5 °C in the shade, +3 °C in the sun and another +3 °C on a flat roof with walls closer than 3 m. Recirculation adds 1–3 K. The second mistake: an open or closed-circuit cooling tower chosen without taking the water and the temperature into account. Agree on the design value with the customer before selection; it is a common point of disagreement.
We start with a free consultation, layout options and a feasibility study: submit a request or call +7 (800) 333-49-96.
Let us size a cooling system for your site
An engineer will select the equipment and send you a calculation. Free of charge, no obligation.