For general contractors and EPC companies — a cooling package for your project

In brief. A general contractor or EPC company answers to the client for the whole facility, and cooling is one line of the estimate. We cover that line in full — selection from a questionnaire, documents for design and expert review, NCT equipment with a pump skid, control panel and tank under one contract, installation supervision and commissioning.

A general contractor or EPC company is responsible to the client for the whole facility: schedule, budget and handover. The cooling system is one item in that scope, but if it arrives late or fails design review (state expert review), the whole schedule slips. Cold Energy covers this item in full: we select the equipment, provide design documentation, manufacture NCT equipment at our own plant in Sertolovo, Leningrad Region, add Thermax machines where needed, deliver everything as a package and commission it.

We work with general contractors, EPC companies and refrigeration installers at industrial plants, in power generation, at oil and gas facilities and in commercial real estate. The equipment goes into your scope, and the contract is with you.

What does a general contractor need from a cooling supplier?

What the contractor needs What we provide
Understand quickly what to install Selection and a commercial offer based on the client's questionnaire or specification
Pass design review Equipment passport, dimensional drawings, performance data, standard piping diagrams
Cover the line item with a single contract An NCT package: cooling tower, dry cooler or chiller with a pump skid, control panel and tank
Stay on schedule Lead time and rated performance are written into the contract

How does selection for your tender work?

Selection starts with a selection questionnaire. If the client has its own specification, send it as is; the engineer will identify any missing parameters and follow up with questions. Our engineers select equipment in our NCT Select selection software. We do not give access to the software itself: the engineer does the calculation and is responsible for it.

You receive the models, capacity at design site conditions, dimensions and weight, and the scope of supply. If the client compares several options (open or closed-circuit tower, cooling tower or dry cooler), the engineer calculates each of them, so your bid rests on a calculation for every option.

What is in the cooling package?

The cooling source, pump skid, control panel, tank and, if needed, a containerized unit come under one contract. We are responsible for making the equipment, piping and controls work together.

NCT pump skid at the plant before shipment
NCT pump skid at the plant before shipment
  • Cooling source — open and closed-circuit cooling towers, dry coolers, chillers, NCT evaporative condensers; for sites with steam or hot water, Thermax absorption chillers, supplied by Cold Energy as the official and exclusive Thermax representative.
  • Pump skid — pump brand to the client's requirements.
  • Control panel — for a dry cooler, the control and protection panel is included as standard; for other equipment the controls are listed in the scope of supply.
  • Tank and water treatment for the recirculating loop.
  • Containerized unit, if the package has to arrive on site assembled.
NCT control panel on site
NCT control panel on site

What delivery times can you plan for?

Some chiller and open cooling tower models are available from stock; otherwise lead time is 10–12 weeks. Closed-circuit towers take 16–18 weeks, dry coolers 10 weeks. We confirm the lead time for the whole package at selection and write it into the contract together with the performance data.

Who installs, and who is responsible for the warranty?

Installation is done by our crew or yours. If yours, our engineers supervise the installation. We carry out commissioning in both cases. The standard warranty is 12 months; the extended warranty is up to 5 years, subject to a service contract with a certified partner and mandatory water treatment.

What training do we offer?

Cold Energy Academy seminar for partners
Cold Energy Academy seminar for partners

The Cold Energy Academy runs training sessions and seminars for partners' staff: how to select the equipment and handle client requests. If cooling in your project is complex (a chiller plant, trigeneration, heat recovery), our design centre can produce the concept and the design.

How to get started

  1. Send the client's questionnaire or specification through the contact form and state the bid deadline.
  2. The engineer clarifies the parameters and selects equipment with options.
  3. Partner terms are discussed with the head office and fixed in the contract.

More for designers is on the partners page, and dealers will find their terms on the dealers page.

Frequently asked questions

Can you select equipment against a specification written for another manufacturer?

Yes. Send the specification and site conditions: water temperatures, flow, climate, installation location. The engineer will select NCT equipment for the same duty and show where the model differs in dimensions, weight or power consumption, so there are no surprises at design review.

What documents do you provide for design review?

Equipment passport, drawings with dimensions and weight, technical specifications, standard piping diagrams. Certificates and declarations are on the certificates page. BIM models in Revit are prepared on request.

The client's deadline is tight. Can you confirm in advance that you can meet it?

Yes. In the request, state the date by which the equipment must be on site. The engineer will check it against the lead time of the selected model and stock availability and suggest an alternative if the date does not work.

Discuss your project: send a request, call +7 (800) 333-49-96 (toll-free within Russia) or email info@colden.ru.

Let us size a cooling system for your site

An engineer will select the equipment and send you a calculation. Free of charge, no obligation.

Contact us